Filter interviews by
I was interviewed in Jan 2025.
A QCPC chart is a quality control process chart used to monitor and improve production processes.
QCPC stands for Quality Control Process Chart.
It is a visual tool used to monitor and improve production processes.
It helps identify trends, patterns, and areas for improvement in the production process.
Examples include control charts, Pareto charts, and scatter diagrams.
Company policy is a set of rules and guidelines established by a company to govern its employees' behavior and actions.
Company policy outlines expectations for employee conduct
It provides guidelines for decision-making and problem-solving
Employees are expected to adhere to company policy to maintain a productive work environment
posted on 18 Jun 2021
I applied via Recruitment Consultant and was interviewed in May 2021. There was 1 interview round.
Achieving 0% ppm (parts per million) is a goal for ensuring high quality in production processes.
ppm is a measurement used to quantify defects or errors in a production process
Achieving 0% ppm means that there are no defects or errors in the produced items
This requires implementing robust quality control measures and continuous improvement
Examples of quality control measures include thorough inspections, standardized p
The candidate should demonstrate their ability to manage small problems in production and material planning.
Provide examples of small problems that you have successfully managed in the past
Explain your problem-solving approach and how you prioritize tasks
Highlight your ability to work under pressure and meet deadlines
Discuss any relevant technical skills or tools you utilize in problem management
Top trending discussions
I applied via Job Fair and was interviewed before Mar 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
posted on 17 Oct 2021
I applied via Campus Placement and was interviewed in Sep 2021. There were 4 interview rounds.
posted on 28 Jun 2020
I applied via Walk-in and was interviewed before Jun 2019. There was 1 interview round.
My family has a diverse background with members involved in various professions and industries.
My father is a doctor and my mother is a teacher.
My older brother is an engineer and my younger sister is studying to become a lawyer.
We have relatives who are business owners, artists, and government employees.
Our family values education and encourages pursuing different career paths.
posted on 27 Mar 2021
Yes, it is important to document all plant parameters for quality control and process improvement.
Documenting plant parameters helps in identifying deviations from standard operating procedures.
It helps in analyzing trends and patterns in the production process.
It aids in making informed decisions for process improvement and optimization.
Examples of plant parameters include temperature, humidity, pressure, flow rate, a
The question is asking for all the parameters and processes involved in the paint treatment process.
Parameters may include temperature, pressure, and chemical concentrations
Processes may include cleaning, priming, painting, and curing
Each parameter and process must be carefully monitored and controlled to ensure quality
Regular maintenance and calibration of equipment is necessary for consistent results
Powder coating parameters process involves setting up the correct temperature, time, and voltage for the powder coating application.
Temperature should be set according to the type of powder being used
Time should be adjusted based on the thickness of the coating required
Voltage should be set to ensure proper adhesion of the powder to the substrate
Other factors such as humidity and airflow should also be considered
Regula...
I applied via Recruitment Consultant and was interviewed in May 2021. There was 1 interview round.
These are terms related to manufacturing processes and techniques.
4m refers to the four factors that affect a process: Man, Machine, Material, and Method.
Poke-yoke is a technique used to prevent errors by designing the process to be mistake-proof.
Maru-A is a Japanese term for visual management, which involves using visual aids to communicate information.
Production analysis involves analyzing the production process to i...
Maru-A is a Japanese term for Gemba walk. 7QC tools are used for quality control.
Maru-A is a technique used to observe and improve processes by walking through the actual work area.
7QC tools are a set of quality control tools used to identify and solve problems in a systematic way.
Examples of 7QC tools include Pareto charts, fishbone diagrams, and control charts.
5's refer to the five safety rules that must be followed in any workplace.
The five safety rules are: Keep the workplace clean and tidy, Use tools and equipment properly, Use personal protective equipment (PPE), Report hazards and incidents, and Follow instructions and procedures.
These rules are designed to prevent accidents and injuries in the workplace.
For example, keeping the workplace clean and tidy can prevent slip...
There is no such thing as 'kizzen'. It is not a valid term or word.
There is no definition or explanation for 'kizzen'
It is possible that the interviewer made a mistake or was testing the candidate's ability to handle unexpected questions
The candidate can politely ask for clarification or context if unsure about a question
I came to danso today by car.
I drove to danso today.
I used my car as the mode of transportation.
I arrived in danso today by driving.
I always drive within the speed limit to ensure safety and compliance with traffic laws.
I always follow the speed limit and drive safely
I prioritize safety and compliance with traffic laws over speed
I never exceed the speed limit while driving
posted on 20 Apr 2021
I was interviewed in Mar 2021.
A control chart is a statistical tool used to monitor and control a process over time.
It helps to identify and analyze variations in a process.
It consists of a central line representing the average value and upper and lower control limits.
Data points falling outside the control limits indicate special causes of variation.
Common types of control charts include X-bar and R charts, X-bar and S charts, and p charts.
Control...
The principle of vernier caliper is based on the concept of vernier scale and the ability to measure small distances accurately.
Vernier caliper is a measuring instrument used to measure the dimensions of an object with high precision.
It consists of a main scale and a sliding vernier scale, which allows for more accurate measurements.
The principle behind vernier caliper is that the vernier scale has a smaller division t...
The number of angles of projection in a drawing depends on the specific requirements and complexity of the object being depicted.
The number of angles of projection can vary depending on the purpose of the drawing.
Common angles of projection include front view, top view, side view, and isometric view.
Additional angles may be required for complex objects or to show specific details.
The number of angles can also depend on...
The angle of projection drawing should be prepared in the third angle projection.
The third angle projection is commonly used in engineering and technical drawings.
In third angle projection, the object is placed in the third quadrant of the orthographic projection.
The top view is placed above the front view, and the right side view is placed to the right of the front view.
This method is widely adopted in many countries ...
based on 1 interview
Interview experience
based on 26 reviews
Rating in categories
Quality Engineer
7
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Team Lead
6
salaries
| ₹2.1 L/yr - ₹2.5 L/yr |
Trainee
5
salaries
| ₹1.5 L/yr - ₹1.8 L/yr |
Senior Engineer
4
salaries
| ₹4.5 L/yr - ₹6.5 L/yr |
Production Engineer
4
salaries
| ₹1.9 L/yr - ₹2 L/yr |
Bharat Forge
Bosch
Samvardhana Motherson Group
Mahindra & Mahindra