Add office photos
Engaged Employer

The BIM Engineers

4.3
based on 170 Reviews
Video summary
Filter interviews by

Airbnb Interview Questions and Answers

Updated 5 Feb 2024
Popular Designations

Q1. How do you use IFC models to reference in RVT file modelling?

Ans.

IFC models can be referenced in RVT file modelling by linking the IFC file to the Revit project and using it as a reference for creating elements.

  • Link the IFC file to the Revit project using the 'Link IFC' command.

  • Specify the desired settings for the IFC file import, such as the insertion point and scale.

  • Once the IFC file is linked, it can be used as a reference to create elements in the RVT file.

  • Elements can be modeled directly on top of the IFC reference or by using it as a...read more

View 1 answer

Q2. Which is the most challenging architectural element to detail in Revit

Ans.

The most challenging architectural element to detail in Revit is the roof.

  • Roofs have complex geometries and require precise detailing

  • Roof intersections and connections with walls can be difficult to model accurately

  • Roof materials and finishes can also be challenging to represent in Revit

  • Roof drainage and gutter systems require careful consideration and planning

View 1 answer

Q3. What is the toughest project type in construction

Ans.

Hospital construction projects are often considered the toughest due to their complexity and strict regulations.

  • Hospital construction projects involve intricate designs and specialized equipment installations.

  • They require extensive coordination between various stakeholders, including architects, engineers, contractors, and healthcare professionals.

  • Strict regulations and codes must be followed to ensure patient safety and compliance with healthcare standards.

  • The construction p...read more

View 1 answer

Q4. LOD levels and their technical names.

Ans.

LOD levels are used in BIM to specify the level of detail in a model, ranging from LOD 100 to LOD 500.

  • LOD 100 - Conceptual design with basic massing and spatial relationships

  • LOD 200 - Basic geometric elements with approximate quantities and sizes

  • LOD 300 - Accurate model with specific system information and quantities

  • LOD 400 - Fabrication level of detail with detailed elements and connections

  • LOD 500 - As-built model with exact details and accurate information

View 1 answer
Discover Airbnb interview dos and don'ts from real experiences

Q5. What is workset in Revit.

Ans.

Workset in Revit is a way to organize and manage elements within a project.

  • Worksets allow users to control visibility, editing permissions, and ownership of elements

  • They can be used to divide a project into manageable sections for team collaboration

  • Examples include creating worksets for different disciplines like architecture, structure, and MEP

View 1 answer

Q6. BIM 360 and it's propose.

Ans.

BIM 360 is a cloud-based platform for construction project management, collaboration, and data sharing.

  • BIM 360 allows for real-time collaboration among project teams

  • It provides tools for document management, design coordination, and quality control

  • Users can access project information from anywhere, at any time

View 1 answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Airbnb

based on 2 interviews
Interview experience
4.0
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter