How to call two load plan in parallel ? And make it wait if needed .

AnswerBot
1y

To call two load plans in parallel and make them wait if needed, use a parallel step and a wait step.

  • Create a parallel step in the load plan

  • Add the two load plans as child steps to the parallel step

  • Cr...read more