Filter interviews by
I have created detailed bill of materials for various mechanical projects including components, quantities, and specifications.
Created detailed bill of materials for mechanical projects
Included components, quantities, and specifications
Ensured accuracy and completeness of the bill of materials
Collaborated with engineers and suppliers to gather necessary information
Top trending discussions
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
posted on 13 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
To create demand in the market, we need to understand the target audience, identify their needs, and offer a unique value proposition.
Conduct market research to understand the target audience and their needs
Analyze competitors and identify gaps in the market
Develop a unique value proposition that addresses the identified needs and gaps
Create a marketing strategy that effectively communicates the value proposition to th...
Notice period is the time between resigning from a job and the last working day, with expectations regarding handover of responsibilities.
Notice period is the duration between submitting a resignation and the last working day.
Expectations during notice period include completing pending tasks, handing over responsibilities, and training the replacement.
Employers may have specific policies regarding notice period, such a...
I applied via Campus Placement and was interviewed before Sep 2022. There were 4 interview rounds.
About Work Culture and how is wfh affecting people
Duration of the aptitude test was around 30 mins
To find the difference in Air and N2 in a plant, analyze the composition and properties of each gas.
Analyze the composition of Air (mainly nitrogen and oxygen) and N2 (pure nitrogen)
Measure the concentration of each gas in the plant
Consider the properties of each gas such as density, boiling point, and reactivity
Use gas detection equipment to identify and quantify the presence of Air and N2
Our plant generates approximately 100 tons of waste per month.
We have implemented waste reduction strategies to minimize our environmental impact.
We segregate waste into different categories for proper disposal and recycling.
Regular waste audits are conducted to track and analyze our waste generation.
Examples: paper waste, plastic waste, organic waste, hazardous waste
HAZOP focuses on identifying potential hazards in a process, while HIRA assesses risks associated with those hazards.
HAZOP stands for Hazard and Operability Study, which is a structured technique used to identify potential hazards in a process plant.
HIRA stands for Hazard Identification and Risk Assessment, which involves assessing the risks associated with identified hazards.
HAZOP is more focused on identifying specif...
based on 1 interview
Interview experience
Assistant Manager
130
salaries
| ₹5 L/yr - ₹10.3 L/yr |
Deputy Manager
93
salaries
| ₹8.2 L/yr - ₹16.3 L/yr |
Junior Engineer
90
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Assistant Engineer
50
salaries
| ₹3 L/yr - ₹7.9 L/yr |
Territory Sales Incharge
48
salaries
| ₹4.1 L/yr - ₹9.4 L/yr |
Berger Paints
Pidilite Industries
SRF
Kansai Nerolac Paints