Injection moulding problems include flash, warping, sink marks, short shots, etc.
Flash: Excess material escaping from the mould
Warping: Deformation of the moulded part due to uneven cooling
Sink marks: Indentations on the surface caused by uneven cooling or insufficient packing
Short shots: Incomplete filling of the mould resulting in incomplete parts
Burn marks: Discoloration or charring of the part due to overheating
Jet...
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
posted on 2 Apr 2024
Casting should be thorough
Aluminium die Casting
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
GD&T symbols are used to specify the geometric requirements of a part or assembly.
GD&T stands for Geometric Dimensioning and Tolerancing
Symbols include: flatness, circularity, perpendicularity, concentricity, position, and more
Each symbol has a specific meaning and is used to communicate precise engineering requirements
GD&T is used in industries such as aerospace, automotive, and manufacturing
Example: A position symbol...
Cp, Cpk, Pp, and Ppk are statistical process control indices used to measure process capability and performance.
Cp and Cpk measure how well a process meets its specifications, with Cpk being more accurate for non-centered processes.
Pp and Ppk measure how well a process performs relative to its natural variation, with Ppk being more accurate for non-centered processes.
All four indices are calculated using the process me...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
Lean manufacturing is a systematic approach to eliminate waste and improve efficiency in production processes. 5'S is a method to organize and maintain a clean workplace.
Lean manufacturing focuses on reducing waste, such as overproduction, waiting time, transportation, inventory, motion, and defects.
It aims to improve efficiency, quality, and customer satisfaction.
5'S is a set of five principles: Sort, Set in Order, Sh...
TPM stands for Total Productive Maintenance and refers to a systematic approach to equipment maintenance. Industrial wastes are unwanted materials or byproducts generated during industrial processes.
TPM is a proactive maintenance strategy aimed at maximizing equipment effectiveness and minimizing downtime.
It involves regular inspections, preventive maintenance, and continuous improvement of equipment and processes.
TPM ...
PPE (Personal Protective Equipment) is important for ensuring the safety and well-being of individuals in various industries.
PPE helps protect against physical, chemical, and biological hazards.
It includes items such as helmets, gloves, goggles, masks, and protective clothing.
PPE is crucial in industries like construction, healthcare, manufacturing, and mining.
Examples of PPE usage include wearing a hard hat on a const...
based on 1 interview
Interview experience
Quality Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Key Account Manager
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Lakshmi Precision Screws
Precision Camshafts
TVS Sundram Fasteners
Caparo Engineering India