Q1. Does water flow inside the pipe for the required tonnage of AC?

Ans.

Yes, water flows inside the pipe for the required tonnage of AC.

  • Water flows inside the pipe to carry the heat away from the indoor unit to the outdoor unit.

  • The amount of water flow required depends on the tonnage of the AC and the design of the system.

  • The water flow rate is typically measured in gallons per minute (GPM) or liters per minute (LPM).

Add your answer

Q2. What is the air velocity at cooling coil?

Ans.

The air velocity at cooling coil depends on the design and specifications of the HVAC system.

  • Air velocity at cooling coil is typically between 300-500 feet per minute.

  • The velocity can be adjusted based on the cooling load and desired temperature.

  • Higher air velocity can improve heat transfer but may also increase noise levels.

  • The velocity should be measured and adjusted during commissioning to ensure optimal performance.

Add your answer

Q3. Procedure of Site Checking of Steel and Concreting work.

Ans.

Site checking of steel and concreting work involves verifying materials, dimensions, and quality to ensure compliance with specifications.

  • Verify steel reinforcement bars for correct size, spacing, and alignment.

  • Check concrete mix design and slump test results for concreting work.

  • Inspect formwork for proper installation and alignment.

  • Ensure proper curing methods are being followed for concrete.

  • Use testing equipment like rebar locators and concrete test hammers for quality cont...read more

Add your answer

Q4. What to do if steel coming at site.

Ans.

Inspect the steel for quality and compliance with specifications before accepting it at the site.

  • Check the quality of the steel for any defects or damage.

  • Verify that the steel meets the required specifications and standards.

  • Ensure proper documentation and labeling of the steel materials.

  • Coordinate with suppliers or manufacturers for any discrepancies or issues.

  • Reject any steel that does not meet the quality or specifications.

  • Store the accepted steel materials in a designated ...read more

Add your answer
Discover Diksha Technologies interview dos and don'ts from real experiences

Q5. ACH used for the different field.

Ans.

ACH (Air Changes per Hour) is used in various fields to measure the amount of air exchanged in a space per hour.

  • ACH is commonly used in HVAC design to determine the appropriate ventilation rate for a space.

  • In hospitals, ACH is used to control the spread of airborne infections.

  • ASHRAE recommends a minimum of 6 ACH for operating rooms and 12 ACH for isolation rooms.

  • In cleanrooms, ACH is used to maintain a controlled environment with low levels of particulate matter.

  • ACH can also ...read more

Add your answer

Q6. What is spacing for expansion joint in general

Add your answer
Are these interview questions helpful?

Q7. Frequency of Testing of different items.

Ans.

Frequency of testing varies depending on the item being tested, with some items requiring more frequent testing than others.

  • Frequency of testing should be determined based on risk assessment and regulatory requirements.

  • Critical items may require daily or weekly testing, while less critical items may only need testing on a monthly or quarterly basis.

  • Examples of items that may require frequent testing include critical equipment, raw materials, and finished products.

  • Regular cali...read more

Add your answer

Q8. Procedure of Tile fixing

Ans.

Tile fixing involves preparing the surface, applying adhesive, placing tiles, grouting, and finishing.

  • Prepare the surface by ensuring it is clean, dry, and level.

  • Apply adhesive evenly on the surface using a trowel.

  • Place tiles carefully, ensuring proper alignment and spacing.

  • Grout the tiles by filling the gaps between them with grout.

  • Finish by cleaning off excess grout and sealing the tiles if necessary.

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. Repair of Concrete Work.

Ans.

Repair of concrete work involves identifying the damage, preparing the surface, applying a suitable repair material, and curing the repair properly.

  • Identify the type and extent of damage to the concrete

  • Prepare the damaged area by removing loose debris and cleaning the surface

  • Select a suitable repair material based on the type of damage (e.g. cracks, spalling, delamination)

  • Apply the repair material according to manufacturer's instructions

  • Properly cure the repair to ensure stre...read more

Add your answer

Q10. What is live load on a floor

Add your answer

Q11. Revit family Creation

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Diksha Technologies

based on 10 interviews
Interview experience
4.6
Excellent
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.9
 • 565 Interview Questions
4.4
 • 439 Interview Questions
3.9
 • 179 Interview Questions
3.3
 • 147 Interview Questions
3.7
 • 144 Interview Questions
4.3
 • 139 Interview Questions
View all
Top SMCC Construction India Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter