Q1. Does water flow inside the pipe for the required tonnage of AC?
Yes, water flows inside the pipe for the required tonnage of AC.
Water flows inside the pipe to carry the heat away from the indoor unit to the outdoor unit.
The amount of water flow required depends on the tonnage of the AC and the design of the system.
The water flow rate is typically measured in gallons per minute (GPM) or liters per minute (LPM).
Q2. What is the air velocity at cooling coil?
The air velocity at cooling coil depends on the design and specifications of the HVAC system.
Air velocity at cooling coil is typically between 300-500 feet per minute.
The velocity can be adjusted based on the cooling load and desired temperature.
Higher air velocity can improve heat transfer but may also increase noise levels.
The velocity should be measured and adjusted during commissioning to ensure optimal performance.
Q3. Procedure of Site Checking of Steel and Concreting work.
Site checking of steel and concreting work involves verifying materials, dimensions, and quality to ensure compliance with specifications.
Verify steel reinforcement bars for correct size, spacing, and alignment.
Check concrete mix design and slump test results for concreting work.
Inspect formwork for proper installation and alignment.
Ensure proper curing methods are being followed for concrete.
Use testing equipment like rebar locators and concrete test hammers for quality cont...read more
Q4. What to do if steel coming at site.
Inspect the steel for quality and compliance with specifications before accepting it at the site.
Check the quality of the steel for any defects or damage.
Verify that the steel meets the required specifications and standards.
Ensure proper documentation and labeling of the steel materials.
Coordinate with suppliers or manufacturers for any discrepancies or issues.
Reject any steel that does not meet the quality or specifications.
Store the accepted steel materials in a designated ...read more
Q5. ACH used for the different field.
ACH (Air Changes per Hour) is used in various fields to measure the amount of air exchanged in a space per hour.
ACH is commonly used in HVAC design to determine the appropriate ventilation rate for a space.
In hospitals, ACH is used to control the spread of airborne infections.
ASHRAE recommends a minimum of 6 ACH for operating rooms and 12 ACH for isolation rooms.
In cleanrooms, ACH is used to maintain a controlled environment with low levels of particulate matter.
ACH can also ...read more
Q6. What is spacing for expansion joint in general
Q7. Frequency of Testing of different items.
Frequency of testing varies depending on the item being tested, with some items requiring more frequent testing than others.
Frequency of testing should be determined based on risk assessment and regulatory requirements.
Critical items may require daily or weekly testing, while less critical items may only need testing on a monthly or quarterly basis.
Examples of items that may require frequent testing include critical equipment, raw materials, and finished products.
Regular cali...read more
Q8. Procedure of Tile fixing
Tile fixing involves preparing the surface, applying adhesive, placing tiles, grouting, and finishing.
Prepare the surface by ensuring it is clean, dry, and level.
Apply adhesive evenly on the surface using a trowel.
Place tiles carefully, ensuring proper alignment and spacing.
Grout the tiles by filling the gaps between them with grout.
Finish by cleaning off excess grout and sealing the tiles if necessary.
Q9. Repair of Concrete Work.
Repair of concrete work involves identifying the damage, preparing the surface, applying a suitable repair material, and curing the repair properly.
Identify the type and extent of damage to the concrete
Prepare the damaged area by removing loose debris and cleaning the surface
Select a suitable repair material based on the type of damage (e.g. cracks, spalling, delamination)
Apply the repair material according to manufacturer's instructions
Properly cure the repair to ensure stre...read more
Q10. What is live load on a floor
Q11. Revit family Creation