Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.

Ans.

Escalation is the increase in cost or price of goods or services over time due to various factors.

  • Escalation is significant in construction projects where the cost of materials and labor can increase over time.

  • It is important to factor in escalation when creating project budgets and timelines.

  • The formula for escalation is: Escalated Cost = Base Cost x (1 + Escalation Rate)^Number of Years

  • For example, if the base cost of a project is $100,000 and the escalation rate is 3% per ...read more

View 8 more answers
right arrow

Q2. What is the difference between penality and Liquidity damages?

Ans.

Penalty is a punishment for breach of contract while liquidity damages compensate for financial loss due to breach.

  • Penalty is a fixed amount agreed upon in the contract as a punishment for breach of contract.

  • Liquidity damages compensate for the actual financial loss suffered due to breach of contract.

  • Penalty is usually higher than the actual loss suffered while liquidity damages are calculated based on the actual loss.

  • Penalty is meant to deter breach of contract while liquidi...read more

View 1 answer
right arrow

Q3. What do you understand by Term Basic Price variation?

Ans.

Basic Price variation refers to the change in the cost of materials or labor used in a project.

  • Basic Price variation is a common clause in construction contracts.

  • It allows for adjustments to the contract price based on changes in the cost of materials or labor.

  • The variation can be positive or negative, depending on whether the cost has increased or decreased.

  • The variation is usually calculated using an agreed-upon formula or index.

  • For example, if the cost of steel increases d...read more

View 1 answer
right arrow

Q4. How many types of contract and their importance? What are the advantages and drawbacks of each.

Ans.

There are various types of contracts in construction projects. Each has its own advantages and drawbacks.

  • Types of contracts include lump sum, cost-plus, time and material, and unit price contracts.

  • Lump sum contracts provide a fixed price for the entire project, but can lead to disputes over changes.

  • Cost-plus contracts reimburse the contractor for all costs plus a fee, but can lead to inflated costs.

  • Time and material contracts pay for labor and materials based on actual usage,...read more

View 1 answer
right arrow
Discover Shapoorji Pallonji Group interview dos and don'ts from real experiences

Q5. Wastage litim of rainforcement steel as per cpwd and market practice

Ans.

The wastage limit of reinforcement steel varies as per CPWD and market practice.

  • CPWD allows a wastage limit of 2% for reinforcement steel.

  • However, market practice may vary and some contractors may allow up to 3% wastage.

  • Wastage can occur due to cutting, bending, and handling of steel bars.

  • Proper planning and management can help minimize wastage and save costs.

View 3 more answers
right arrow

Q6. Is Basic price variation is beneficial for a contract or not? If yes, then explain it how?

Ans.

Yes, basic price variation is beneficial for a contract.

  • Basic price variation allows for adjustments to be made to the contract price based on changes in market conditions or material costs.

  • This helps to ensure that the contractor is not unfairly burdened with unexpected costs and can maintain profitability.

  • It also provides a level of transparency and accountability in the contract, as both parties are aware of the potential for price adjustments.

  • For example, if the cost of s...read more

View 1 answer
right arrow

Q7. Rollin margin in rainforcement steel

Ans.

Rolling margin is the extra length of reinforcement steel provided to compensate for any cutting or bending during construction.

  • Rolling margin is usually 5-10% of the total length of reinforcement steel required for a project.

  • It is important to factor in rolling margin during the estimation and procurement of reinforcement steel.

  • For example, if a beam requires 10 meters of reinforcement steel, a rolling margin of 0.5-1 meter should be added to the total length.

  • This ensures th...read more

View 4 more answers
right arrow

Q8. What ia rolling margin

Ans.

Rolling margin is the difference between the selling price and the cost price of goods sold over a specific period of time.

  • Rolling margin helps in determining the profitability of a business over time.

  • It is calculated by subtracting the cost price from the selling price of goods sold.

  • For example, if the cost price of goods sold is $500 and the selling price is $700, the rolling margin would be $200.

Add your answer
right arrow

Q9. What is yield of concrete

Ans.

Yield of concrete refers to the amount of concrete produced from a mixture of cement, aggregates, and water.

  • Yield of concrete is typically measured in cubic meters or cubic yards.

  • It is important for estimating the amount of materials needed for a project.

  • Yield can be affected by factors such as mix design, water-cement ratio, and compaction.

  • For example, a concrete mix with a higher water-cement ratio may have a lower yield.

  • Calculating yield accurately is crucial for cost esti...read more

Add your answer
right arrow

Q10. Billing is code

Ans.

Billing is the process of generating invoices for goods or services provided.

  • Billing involves calculating costs, creating invoices, and sending them to customers.

  • It is important for tracking revenue and ensuring timely payment.

  • Examples of billing software include QuickBooks, FreshBooks, and Zoho Invoice.

View 1 answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Shapoorji Pallonji Group Billing Engineer

based on 5 interviews
2 Interview rounds
Resume Shortlist Round
Aptitude Test Round
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Recently Viewed
SALARIES
EbixCash Limited
SALARIES
EbixCash Limited
SALARIES
Bosch Global Software Technologies
SALARIES
EbixCash Limited
INTERVIEWS
Shapoorji Pallonji Group
No Interviews
SALARIES
EbixCash Limited
SALARIES
EbixCash Limited
SALARIES
EbixCash Limited
SALARIES
EbixCash Limited
SALARIES
EbixCash Limited
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter