What would you do if the design called for tight tolerances and the part was manufactured out of tolerance

AnswerBot
9mo

I would assess the impact of the out-of-tolerance part and determine if it can still function within acceptable limits or if it needs to be reworked or replaced.
Assess the functionality of the part wi...read more