i
Sarjan Watertech
Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
I appeared for an interview before Feb 2021.
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
Pumps and aerators are used to move fluids and gases respectively.
Pumps work by creating a pressure difference to move fluids from one place to another.
Aerators introduce air into liquids to increase oxygen levels and promote biological processes.
Types of pumps include centrifugal, positive displacement, and jet pumps.
Types of aerators include surface aerators, diffused aerators, and mechanical aerators.
posted on 28 Sep 2021
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
Marketing is about creating demand while sales is about fulfilling demand. I prefer both as they are interdependent.
Marketing involves creating brand awareness, identifying target audience, and promoting products/services through various channels.
Sales involves converting leads into customers, negotiating deals, and closing sales.
Marketing and sales are interdependent as marketing creates demand and sales fulfills it.
A...
posted on 23 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
To arrest leakages, identify the source, implement preventive measures, monitor regularly, and take corrective actions.
Identify the source of leakages through regular audits and inspections.
Implement preventive measures such as installing leak detection systems or improving maintenance procedures.
Monitor regularly by analyzing data and conducting spot checks.
Take corrective actions promptly to fix leaks and prevent fut
Grouting methods include cementitious grouting, chemical grouting, and pressure grouting.
Cementitious grouting involves mixing cement, water, and additives to create a flowable material for filling gaps.
Chemical grouting uses chemical compounds to fill voids and stabilize soil or rock formations.
Pressure grouting injects grout under pressure to fill cracks and voids in structures.
Examples: epoxy grouting, urethane grou
Approximately 500 cubic yards of concrete were consumed in the last project.
The amount of concrete consumed in a project can vary depending on the size and scope of the project.
Factors such as the type of structure being built, the design specifications, and the location can all impact the amount of concrete needed.
For example, a small residential project may only require a few cubic yards of concrete, while a large co...
posted on 10 Dec 2022
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
Detailed information about the previous company where i worked.Discussed with project manager regarding my roles and assignments i had taken on work location.Along with that we discussed about my academic projects and skills that i had mastered in my career
Interviewers gave me the task to elaborate the design of pollution control equipments and assessments
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
English grammar mathematics logical reasoning
based on 1 interview
Interview experience
Senior Manager
4
salaries
| ₹6 L/yr - ₹6 L/yr |
Production Engineer
4
salaries
| ₹3.1 L/yr - ₹3.5 L/yr |
Store Executive
4
salaries
| ₹4.2 L/yr - ₹4.2 L/yr |
Exim Executive
4
salaries
| ₹1.8 L/yr - ₹1.8 L/yr |
Head Operations
3
salaries
| ₹14.4 L/yr - ₹16 L/yr |
VA Tech Wabag
Nalco water
Harsco
WM Universal Solutions Private Limited