Assume a plumbing shaft is being shut off on the 40th floor. How should the soil and waste pipe be terminated, if there are two more additional floors above it?

AnswerBot
11mo
The soil and waste pipe should be terminated with a cleanout at the 40th floor and extended to the roof for future access.
Terminate the soil and waste pipe with a cleanout at the 40th floor to allow f...read more