Filter interviews by
Clear (1)
Top trending discussions
I applied via Walk-in and was interviewed before Jul 2020. There were 3 interview rounds.
posted on 22 Jul 2021
I applied via Indeed and was interviewed in Jun 2021. There was 1 interview round.
posted on 14 Nov 2019
I was interviewed before Sep 2022.
Production is the process of creating goods and services using resources like labor, machinery, and materials.
Production involves converting raw materials into finished products.
It includes activities such as manufacturing, assembling, packaging, and quality control.
Efficient production processes can lead to cost savings and increased output.
Examples of production include car manufacturing, food processing, and clothin
Production efficiency can be determined by analyzing production output, minimizing waste, optimizing processes, and utilizing resources effectively.
Analyze production output to ensure it meets targets and quality standards
Minimize waste by implementing lean manufacturing principles
Optimize processes by identifying bottlenecks and inefficiencies
Utilize resources effectively by managing inventory levels and production sc
5S is a methodology for organizing a workplace to improve efficiency and effectiveness by maintaining cleanliness and organization.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and inspect the work area regularly
Standardize - establish guidelines and procedures for maintaining the first 3 S's
Sustain - ensure the 5S system is co...
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Kanban is a lean manufacturing system that ensures smooth inventory flow. Material shortage is managed by effective planning and communication with vendors. Manpower is handled by proper training and allocation of resources.
Kanban is a visual system that helps in managing inventory levels and production flow
Effective planning and communication with vendors helps in managing material shortage
Proper training and allocati...
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I have achieved significant improvements in all 4M areas throughout my career.
Implemented new machine maintenance program resulting in 20% decrease in downtime
Developed new material sourcing strategy resulting in 15% cost savings
Redesigned production line layout resulting in 30% increase in efficiency
Implemented lean manufacturing principles resulting in 25% reduction in waste
Trained and mentored team members resulting...
posted on 21 Mar 2024
I applied via Campus Placement and was interviewed in Sep 2023. There was 1 interview round.
posted on 20 Aug 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Company is a leading manufacturer of industrial equipment with a focus on innovation and sustainability.
Company was founded in 1990 and has since grown to become a global leader in the industry
They specialize in producing high-quality machinery for various sectors such as automotive, aerospace, and energy
Company has a strong commitment to sustainability and has implemented several green initiatives in their production
Yes, I can read and write in English.
I am fluent in English and can read and write proficiently.
I have experience communicating in English in previous roles.
I have completed education in English medium.
I have taken English language proficiency tests like TOEFL or IELTS.
A BIW fixture is a tool used in automotive manufacturing to hold and position the body-in-white during assembly.
BIW stands for Body-In-White, which refers to the stage of automotive manufacturing where the car body is assembled but not yet painted or trimmed.
The fixture is designed to hold the car body in a precise position during assembly, ensuring that all components fit together correctly.
BIW fixtures are typically ...
321 principle is a method of prioritizing tasks based on their urgency and importance.
The principle suggests dividing tasks into three categories: important and urgent, important but not urgent, and urgent but not important.
Tasks that are both important and urgent should be given the highest priority.
Examples of tasks that fall into each category include: important and urgent - a deadline for a project, important but n...
based on 1 interview
Interview experience
based on 13 reviews
Rating in categories
Service Engineer
199
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Service Engineer
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Apprentice Trainee
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Technologist
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Atlas Copco
Kennametal
Metso
TK Elevator