Add office photos
Engaged Employer

Reliance Industries

4.0
based on 15k Reviews
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by

10+ Interview Questions and Answers

Updated 16 Nov 2024
Popular Designations

Q1. Do you wild about your grammar mistakes?

Ans.

No, I am not wild about my grammar mistakes.

  • I understand that mistakes happen and I am always willing to learn and improve.

  • I take constructive criticism well and use it to better myself.

  • I make an effort to proofread my work and use tools like spell check to catch errors.

  • I prioritize clear communication and understand the importance of proper grammar in professional settings.

View 5 more answers

Q2. Wha do you think if you are going to take property for commercial use, what are documents to be required

Ans.

Documents required for taking property for commercial use

  • Title deed of the property

  • NOC from the local authorities

  • Building plan approval

  • Environmental clearance certificate

  • Fire safety certificate

  • Tax receipts

  • Lease agreement (if applicable)

View 1 answer

Q3. What is plan 11 and plan 32 in Mechanical seal ?

Ans.

Plan 11 and Plan 32 are cooling plans used in mechanical seals to prevent overheating.

  • Plan 11 involves circulating cool water through the seal chamber and discharging it to a drain or cooling tower.

  • Plan 32 involves circulating cool water through the seal chamber and then through a heat exchanger before discharging it.

  • Plan 11 is used for low-pressure applications while Plan 32 is used for high-pressure applications.

  • Both plans are used to prevent overheating and prolong the lif...read more

View 3 more answers

Q4. How to prevent leakage in running acid pipeline?

Ans.

To prevent leakage in running acid pipeline, proper material selection, regular maintenance, and monitoring are necessary.

  • Select appropriate materials for the pipeline based on the type and concentration of acid being transported.

  • Regularly inspect and maintain the pipeline to ensure it is in good condition.

  • Monitor the pipeline for any signs of leakage or corrosion, and take immediate action if any issues are detected.

  • Implement safety measures such as emergency shutdown system...read more

View 1 answer
Discover null interview dos and don'ts from real experiences

Q5. How to BBS Calculation and MB preparation

Ans.

BBS Calculation and MB preparation involve analyzing data and creating reports for decision-making.

  • Collect relevant data for BBS Calculation and MB preparation

  • Analyze the data to identify trends and patterns

  • Use appropriate tools and software for calculations

  • Prepare reports with key findings and recommendations

  • Present the reports to stakeholders for decision-making

Add your answer

Q6. What is Site excutive role and responsibilities

Ans.

Site executives oversee operations at a specific location, ensuring smooth functioning and achieving organizational goals.

  • Managing day-to-day operations at the site

  • Supervising staff and ensuring they are properly trained

  • Implementing and enforcing company policies and procedures

  • Monitoring performance metrics and making adjustments as needed

  • Communicating with upper management to provide updates and address any issues

  • Ensuring compliance with regulations and safety standards

  • Handl...read more

Add your answer
Are these interview questions helpful?

Q7. Type of permit and how to work with permit

Ans.

Different types of permits are required for various activities, and working with permits involves understanding the regulations, applying for the permit, and complying with its conditions.

  • Identify the specific type of permit required for the activity or project.

  • Research the regulations and requirements for obtaining the permit.

  • Submit the necessary documentation and application forms to the relevant authority.

  • Ensure compliance with the conditions and restrictions outlined in t...read more

Add your answer

Q8. What RCA?what are types of RCA METHOD?

Ans.

RCA stands for Root Cause Analysis. There are various methods of RCA including 5 Whys, Fishbone Diagram, Fault Tree Analysis, and Pareto Analysis.

  • Root Cause Analysis (RCA) is a systematic process for identifying the underlying causes of problems or incidents.

  • Types of RCA methods include 5 Whys, Fishbone Diagram, Fault Tree Analysis, and Pareto Analysis.

  • 5 Whys involves asking 'why' multiple times to get to the root cause of a problem.

  • Fishbone Diagram (Ishikawa diagram) visuall...read more

View 1 answer
Share interview questions and help millions of jobseekers 🌟

Q9. What means M25 Grade of concrete

Ans.

M25 Grade of concrete refers to the mix ratio of cement, sand, and aggregate used in construction.

  • M25 Grade of concrete has a compressive strength of 25 MPa (megapascals) after 28 days of curing.

  • The mix ratio for M25 Grade concrete is 1:1:2 (1 part cement, 1 part sand, 2 parts aggregate).

  • It is commonly used in the construction of residential buildings, bridges, and pavements.

Add your answer

Q10. explanation of SLD of Whole Plant

Ans.

SLD of Whole Plant refers to the Standard Loading Diagram of the entire plant.

  • SLD is a graphical representation of the electrical system of the plant.

  • It shows the distribution of power from the source to various equipment and devices.

  • SLD helps in identifying the electrical loads and their interconnections.

  • It also helps in troubleshooting electrical faults and planning for future expansions.

  • Example: SLD of a power plant would show the generators, transformers, switchgear, and ...read more

Add your answer

Q11. Final CTC Annually.....

Ans.

The final CTC annually is negotiable based on the job role and responsibilities.

  • The final CTC annually is dependent on the job role and responsibilities.

  • Negotiations can be made based on the candidate's experience and qualifications.

  • The company's budget and policies also play a role in determining the final CTC.

  • For example, a manager in a multinational company may have a higher final CTC than a manager in a startup.

Add your answer

Q12. Instrument maintenance technique ?

Ans.

Instrument maintenance technique involves regular cleaning, calibration, and inspection to ensure proper functioning.

  • Regularly clean instruments to prevent buildup of debris or contaminants

  • Calibrate instruments to ensure accurate readings

  • Inspect instruments for any signs of damage or wear

  • Follow manufacturer's instructions for maintenance and storage

  • Train staff on proper handling and maintenance of instruments

  • Keep detailed records of maintenance and repairs

  • Examples: cleaning s...read more

Add your answer

Q13. Explain MTTR & MTBF

Ans.

MTTR stands for Mean Time To Repair, the average time taken to repair a failed system. MTBF stands for Mean Time Between Failures, the average time between failures of a system.

  • MTTR is the average time taken to repair a system after a failure.

  • MTBF is the average time between failures of a system.

  • MTTR + MTBF = Total system uptime

  • MTTR is crucial in determining system reliability and maintenance efficiency.

  • For example, if a system has an MTBF of 100 hours and an MTTR of 2 hours,...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at null

based on 6 interviews in the last 1 year
2 Interview rounds
Technical Round
HR Round
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Manager Interview Questions from Similar Companies

3.8
 • 37 Interview Questions
3.9
 • 24 Interview Questions
3.4
 • 15 Interview Questions
3.9
 • 14 Interview Questions
4.1
 • 12 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter