Connect Ropes Problem Statement
Given a number of ropes denoted as 'N' and an array containing the lengths of these ropes, your task is to connect the ropes into one single rope. The cost to connect two ropes is determined by the sum of their lengths. Your goal is to find the minimum cost required to connect all the ropes.
Input:
The first line of input consists of a single integer T, indicating the number of test cases to handle.
Each test case includes:
- The first line specifies the number of ropes, N.
- The second line provides the rope lengths as N space-separated integers.
Output:
For each test case, output a single integer representing the minimum cost to connect all the ropes. Print each result on a new line.
Example:
Input:
T = 1
N = 4
Lengths = [4, 3, 2, 6]
Output:
29
Constraints:
1 <= T <= 10
1 <= N <= 104
1 <= length[i] <= 104
- Time Limit: 1 second
Note:
You do not need to print anything as it is already handled. Implement the provided function to compute the necessary result.

AnswerBot
4mo
The task is to find the minimum cost required to connect all the ropes by summing their lengths.
Iterate through the ropes and connect the two shortest ropes at each step to minimize cost
Use a priority...read more
MOHAMMED MUJAMMIL S IT
2y
import java.util.Arrays;
import java.util.Scanner;
class Ropes{
static int mincost(int[] arr,int N){
int res1=0,res2=0,A=0;
A=N-1;
for (int i=0 ; i<N;i++){
if(i==0){
res1+=arr[i]*arr[i+1];
}
else{
res2+=arr[i]*(...read more
Antony Praveen
4mo
Bro this code is wrong import java.util.*; public class MinimumCostToConnenctRopes { public static v...read more
Help your peers!
Add answer anonymously...
Mr Cooper Software Developer interview questions & answers
A Software Developer was asked 11mo agoQ. What is a linked list?
A Software Developer was asked Q. Sort 0 1 2 Problem Statement Given an integer array arr of size 'N' containing o...read more
A Software Developer was asked Q. Idempotent Matrix Verification Determine if a given N * N matrix is an idempoten...read more
Popular interview questions of Software Developer
A Software Developer was asked 11mo agoQ1. What is a linked list?
A Software Developer was asked Q2. Sort 0 1 2 Problem Statement Given an integer array arr of size 'N' containing o...read more
A Software Developer was asked Q3. Idempotent Matrix Verification Determine if a given N * N matrix is an idempoten...read more
Stay ahead in your career. Get AmbitionBox app


Trusted by over 1.5 Crore job seekers to find their right fit company
80 L+
Reviews
10L+
Interviews
4 Cr+
Salaries
1.5 Cr+
Users
Contribute to help millions
AmbitionBox Awards
Get AmbitionBox app

