Filter interviews by
P&ID is a diagram that shows the interconnection of process equipment and instrumentation. Automation and control system is a system that controls and monitors industrial processes. Open loop and closed loop systems are used for different purposes. PLC, SCADA, and DCs are used for automation and control.
P&ID stands for Piping and Instrumentation Diagram
Automation and control system is used to control and monitor indust...
Top trending discussions
posted on 13 Mar 2024
posted on 3 Apr 2024
What is your role in the company, and how did you achieve your target?
posted on 11 Mar 2024
posted on 14 Feb 2025
I appeared for an interview before Feb 2024.
Implementing lean manufacturing principles can help reduce cycle time and setup time.
Implementing Single Minute Exchange of Die (SMED) techniques to reduce setup time
Optimizing production flow to minimize waiting time and bottlenecks
Utilizing automation and technology to streamline processes
Training employees on efficient work practices and continuous improvement
Regularly reviewing and analyzing production data to iden
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
I am currently earning $60,000 per year.
Current salary is $60,000 per year
Salary is subject to negotiation based on job responsibilities and benefits
Previous salary may not accurately reflect current market value
I have 5 years of experience in HVAC installation, maintenance, and repair.
I have worked in the HVAC industry for 5 years
Experience includes installation, maintenance, and repair of HVAC systems
Familiar with troubleshooting and problem-solving in HVAC systems
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Aims to increase efficiency and reduce costs
Involves all employees in the process
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
based on 2 reviews
Rating in categories
Management Trainee
16
salaries
| ₹9 L/yr - ₹9.9 L/yr |
Deputy Manager
7
salaries
| ₹13 L/yr - ₹16 L/yr |
Manager
5
salaries
| ₹13 L/yr - ₹21 L/yr |
Technician
5
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Graduate Apprentice Trainee
4
salaries
| ₹0.6 L/yr - ₹1.5 L/yr |
Dhoot Transmission
Amphenol Interconnect
Ag Industries
Saud Bahwan Group