Filter interviews by
P&ID is a diagram that shows the interconnection of process equipment and instrumentation. Automation and control system is a system that controls and monitors industrial processes. Open loop and closed loop systems are used for different purposes. PLC, SCADA, and DCs are used for automation and control.
P&ID stands for Piping and Instrumentation Diagram
Automation and control system is used to control and monitor indust...
Top trending discussions
posted on 13 Mar 2024
posted on 3 Apr 2024
What is your role in the company, and how did you achieve your target?
posted on 18 Aug 2023
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
Parameters like mold temperature, pouring temperature, and cooling rate can reduce the casting cycle time without affecting quality.
Mold temperature
Pouring temperature
Cooling rate
I applied via Company Website and was interviewed in Dec 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Aims to increase efficiency and reduce costs
Involves all employees in the process
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
based on 2 reviews
Rating in categories
Management Trainee
16
salaries
| ₹9 L/yr - ₹9.9 L/yr |
Deputy Manager
7
salaries
| ₹13 L/yr - ₹16 L/yr |
Manager
5
salaries
| ₹13 L/yr - ₹21 L/yr |
Technician
5
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Graduate Apprentice Trainee
4
salaries
| ₹0.6 L/yr - ₹1.5 L/yr |
Dhoot Transmission
Amphenol Interconnect
Ag Industries
Saud Bahwan Group