Filter interviews by
Clear (1)
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
The procedure for inward involves receiving, inspecting, and storing incoming goods in the warehouse.
Receive the goods from the supplier
Inspect the goods for any damages or discrepancies
Verify the quantity and quality of the goods
Record the details of the incoming goods in the inventory system
Assign a location for storage
Label the goods with appropriate identification
Arrange for transportation of the goods to the desig
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Jan 2020. There were 3 interview rounds.
I have 5 years of experience in managing warehouse operations, including inventory management, logistics, and team management.
Managed inventory levels to ensure timely order fulfillment
Implemented new warehouse layout to improve efficiency
Trained and supervised a team of 10 warehouse associates
Coordinated with logistics team to ensure timely delivery of goods
Maintained accurate records of inventory and shipments
It depends on the size and weight of the part loads. Generally, a 20 feet container can hold up to 10-12 part loads.
The size and weight of the part loads determine how many can fit in a 20 feet container.
On average, a 20 feet container can hold 10-12 part loads.
It's important to consider the stacking and packing of the part loads to maximize space.
The type of goods being transported may also affect the number of part l
Service ratio of a warehouse is the ratio of orders shipped on time to total orders received.
Service ratio is a key performance indicator for measuring warehouse efficiency.
It helps in determining the warehouse's ability to meet customer demand.
A high service ratio indicates that the warehouse is meeting customer expectations by shipping orders on time.
For example, if a warehouse receives 100 orders and ships 95 of the...
Warehouse manpower productivity can be calculated by dividing the total output by the total number of employees.
Determine the total output of the warehouse over a specific period of time
Count the total number of employees working in the warehouse during that same period
Divide the total output by the total number of employees to get the productivity rate
Example: If the warehouse produced 10,000 units in a week and had 5...
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
I have experience in fuel system layout, solving top complaints, and understanding how sensors work.
Fuel system layout involves designing and arranging components such as fuel tanks, pumps, filters, and injectors.
I have successfully resolved customer complaints related to fuel efficiency, engine performance, and fuel leaks.
Sensors work by detecting changes in physical or chemical properties and converting them into ele...
I applied via LinkedIn and was interviewed before Feb 2020. There was 1 interview round.
I applied via Shine and was interviewed before Dec 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Dec 2019. There were 5 interview rounds.
Implementing lean manufacturing principles, optimizing machine utilization, and investing in automation can improve productivity in machine shops.
Implementing lean manufacturing principles such as 5S, Kaizen, and Kanban can help reduce waste and improve efficiency.
Optimizing machine utilization by scheduling preventive maintenance, reducing setup times, and improving workflow can increase productivity.
Investing in auto...
ABC costing is a method of assigning costs to products based on their consumption of resources. Industrial engineers play a key role in implementing and optimizing ABC costing systems.
ABC costing stands for Activity-Based Costing
It is a method of assigning costs to products based on the resources they consume
Industrial engineers play a key role in implementing and optimizing ABC costing systems
They help identify the ac...
VA/VE stands for Value Analysis/Value Engineering. It is a systematic approach to improve the value of a product or service.
VA/VE aims to reduce costs while maintaining or improving the quality of the product or service.
It involves analyzing the functions of a product or service and identifying areas where costs can be reduced without compromising quality.
Examples of VA/VE projects include redesigning a product to use ...
I am interested in Ashok Leyland because of its reputation in the industry. I believe my skills in management and leadership can contribute to the company's growth.
Ashok Leyland has a strong presence in the commercial vehicle industry
The company has a reputation for innovation and quality
I am impressed by the company's commitment to sustainability and social responsibility
As Deputy Manager, I will use my skills in mana...
Aerodynamics degree of freedom refers to the number of independent variables required to describe the motion of an object in a fluid.
Aerodynamics degree of freedom is determined by the number of independent variables required to describe the motion of an object in a fluid.
The degree of freedom is dependent on the number of dimensions in which the object is moving.
For example, a two-dimensional object moving in a fluid ...
I chose the automobile industry because of my passion for cars and the opportunity to work with advanced technology.
Passion for cars and automobiles
Opportunity to work with advanced technology
Fascination with the industry's constant innovation and development
Desire to be a part of a dynamic and exciting field
Interest in the business and marketing aspects of the industry
Normal class 12th standard level type
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
A detailed project plan and testing documents are required for timely completion of product development testing.
Develop a project plan with clear timelines and milestones
Create a testing plan that outlines the testing process and criteria
Document all testing results and issues for future reference
Regularly review and update the project and testing plans as needed
Collaborate with the development team to ensure testing i...
4 wheeler experience can help in understanding basic mechanics and troubleshooting skills in 2 wheeler industry.
Basic knowledge of engines, transmission, and suspension systems can be applied to both 4 wheeler and 2 wheeler industry.
Experience in diagnosing and fixing common issues in 4 wheeler can help in identifying similar issues in 2 wheeler.
Understanding of safety protocols and regulations can be applied to both i...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Design Engineer
141
salaries
| ₹0 L/yr - ₹0 L/yr |
Lead Engineer
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
133
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
102
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
94
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Tata Motors
Mahindra & Mahindra
Ashok Leyland