i
Livio Building Systems
Filter interviews by
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Weld material deposit can be calculated by determining the volume of the weld bead and multiplying it by the density of the material.
Calculate the volume of the weld bead by measuring the length, width, and height of the weld.
Multiply the volume by the density of the material to get the weld material deposit.
For example, if the weld bead has a volume of 10 cubic inches and the material density is 0.3 lb/in^3, the weld
ASTM codes commonly referred for raw materials include ASTM A36, ASTM A53, ASTM A106, etc.
ASTM A36 is a standard specification for carbon structural steel
ASTM A53 is a standard specification for pipe, steel, black and hot-dipped, zinc-coated, welded and seamless
ASTM A106 is a standard specification for seamless carbon steel pipe for high-temperature service
The weight of materials can be calculated by multiplying the volume of the material by its density.
Calculate the volume of the material (length x width x height)
Determine the density of the material (usually in kg/m^3)
Multiply the volume by the density to get the weight
Example: Weight of a 1m x 1m x 1m block of concrete with density 2400 kg/m^3 = 1m^3 x 2400 kg/m^3 = 2400 kg
Top trending discussions
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To conduct a slump test, fill a metal cone with concrete, compact it, remove the cone, and measure the slump.
Clean the cone and moisten it with water.
Fill the cone with concrete in three layers, compacting each layer with a rod.
Remove the cone and place it next to the slump.
Measure the difference in height between the top of the cone and the highest point of the slump.
Repeat the test at least twice and take the average
Minimum cement content for M25 Grade is 300 kg/m³.
M25 grade concrete has a minimum compressive strength of 25 MPa.
The water-cement ratio should not exceed 0.50.
The cement content can vary based on factors such as aggregate size, shape, and grading.
The cement content should be adjusted based on the results of trial mixes.
I expect a competitive salary based on industry standards and my experience.
I have researched the industry standards for QA QC Engineer salaries
I have taken into account my experience and skills
I am open to negotiation based on the specific job responsibilities and benefits package
I am looking for a fair and competitive salary that reflects my value to the company
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Aug 2020. There were 6 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
Salary discusses boss and hr
I applied via Campus Placement and was interviewed before Aug 2020. There were 6 interview rounds.
Data cleaning best practices
Remove duplicate records
Handle missing values
Standardize data formats
Correct inconsistent data
Validate data integrity
Remove outliers
Normalize data
Handle data inconsistencies
Ensure data accuracy
Logistic regression is a statistical method used to analyze and model the relationship between a categorical dependent variable and one or more independent variables.
It is a type of regression analysis used for predicting the probability of a categorical outcome
It is commonly used in binary classification problems
It uses a logistic function to model the relationship between the independent variables and the dependent v...
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
I appeared for an interview in Feb 2025, where I was asked the following questions.
based on 1 interview
Interview experience
BIM Engineer
13
salaries
| ₹4.2 L/yr - ₹10 L/yr |
Project Engineer
7
salaries
| ₹8 L/yr - ₹11 L/yr |
Procurement and Contracts Engineer
7
salaries
| ₹6.5 L/yr - ₹11.5 L/yr |
Project Manager
6
salaries
| ₹8.2 L/yr - ₹12 L/yr |
Project Coordinator
6
salaries
| ₹6.5 L/yr - ₹8.5 L/yr |
Bahwan Engineering
Eversendai
Descon Engineering
GS Engineering & Construction