Filter interviews by
I applied via Company Website and was interviewed in Dec 2021. There were 4 interview rounds.
Top trending discussions
Production is the process of creating goods or services, while manufacturing is a subset of production that involves the creation of physical goods.
Production involves both goods and services, while manufacturing is limited to physical goods.
Production is a broader term that includes manufacturing, while manufacturing is a subset of production.
Manufacturing involves the use of machinery and tools to create physical goo...
posted on 26 Sep 2021
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
posted on 10 Oct 2023
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
General knowledge , aptitude test
posted on 28 Feb 2023
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
Rework and rejection PPM refers to the number of defective products in a production run.
PPM stands for parts per million and is used to measure the number of defective products in a production run.
Rework PPM refers to the number of products that need to be reworked due to defects.
Rejection PPM refers to the number of products that are rejected due to defects.
Reducing rework and rejection PPM is important for improving ...
Machine breakdown time analysis is crucial for production efficiency.
Analyzing machine breakdown time helps identify the root cause of the issue.
It helps in implementing preventive measures to avoid future breakdowns.
It also helps in optimizing maintenance schedules and reducing downtime.
Data can be collected through sensors, maintenance logs, and operator feedback.
Analyzing breakdown time can also help in identifying
A BIW fixture is a tool used in automotive manufacturing to hold and position the body-in-white during assembly.
BIW stands for Body-In-White, which refers to the stage of automotive manufacturing where the car body is assembled but not yet painted or trimmed.
The fixture is designed to hold the car body in a precise position during assembly, ensuring that all components fit together correctly.
BIW fixtures are typically ...
321 principle is a method of prioritizing tasks based on their urgency and importance.
The principle suggests dividing tasks into three categories: important and urgent, important but not urgent, and urgent but not important.
Tasks that are both important and urgent should be given the highest priority.
Examples of tasks that fall into each category include: important and urgent - a deadline for a project, important but n...
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
posted on 3 Apr 2022
I applied via Company Website
I am expecting a competitive CTC based on my qualifications and experience.
I have a strong educational background and relevant work experience.
I have successfully completed internships and projects related to production engineering.
I have acquired valuable skills and knowledge in areas such as process optimization, quality control, and project management.
I am confident in my ability to contribute to the company's produ...
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
I have a Bachelor's degree in Mechanical Engineering and 5 years of experience in production engineering.
Bachelor's degree in Mechanical Engineering
5 years of experience in production engineering
based on 5 reviews
Rating in categories
Junior Engineer
20
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Assistant Manager
19
salaries
| ₹8.5 L/yr - ₹16.5 L/yr |
Senior Engineer
15
salaries
| ₹7.5 L/yr - ₹9 L/yr |
Manager
14
salaries
| ₹8.1 L/yr - ₹23.6 L/yr |
Production Engineer
12
salaries
| ₹6.3 L/yr - ₹11 L/yr |
Larsen & Toubro Limited
Mahindra & Mahindra
Ashok Leyland
Bosch