Filter interviews by
I applied via Approached by Company and was interviewed in Jan 2022. There were 2 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
A packing supervisor is responsible for overseeing the packing process in a warehouse or manufacturing facility.
Supervises packing staff to ensure efficient and accurate packing of products
Monitors inventory levels and orders packing supplies as needed
Ensures compliance with safety regulations and quality standards
Trains new packing employees on packing procedures and equipment usage
Our company policy prioritizes safety, quality, and efficiency in all operations.
Safety is our top priority, with strict adherence to safety protocols and regulations.
Quality control measures are in place to ensure high standards are met in all projects.
Efficiency is emphasized to maximize productivity and meet project deadlines.
Regular training and development programs are provided to employees to uphold company stand...
posted on 18 Aug 2024
M25 ratio is the mix design ratio for concrete which specifies the ratio of cement, sand, and aggregate.
M25 ratio is commonly used in construction for high-strength concrete.
The ratio represents the mix of cement, sand, and aggregate in the concrete mix.
For example, a common M25 mix ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
The length of a steel bar can vary depending on the specific project requirements and specifications.
The length of a steel bar is typically specified in the project drawings or specifications.
Common lengths for steel bars include 20 feet, 30 feet, and 40 feet.
Steel bars can also be custom cut to specific lengths as needed for the project.
posted on 12 Jun 2024
Initial setting time of concrete is the time taken for the concrete to change from a plastic to a solid state.
Initial setting time is typically around 30 minutes to 1.5 hours, depending on the mix design and environmental conditions.
It is important to monitor the initial setting time to ensure proper placement and finishing of the concrete.
Factors affecting initial setting time include temperature, water-cement ratio, ...
posted on 14 Nov 2023
I applied via Naukri.com
J.kumar metro project is a major infrastructure project involving construction of metro rail system.
J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.
The project involves various stages such as planning, design, construction, and implementation.
It may include tasks like excavation, tunneling, track laying, station construction, etc.
The project requires coordination wi...
posted on 15 Jun 2024
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Exam will be conduct for aptitude test
posted on 7 Feb 2022
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Senior Engineer
612
salaries
| ₹3.4 L/yr - ₹11 L/yr |
Deputy Manager
601
salaries
| ₹5.4 L/yr - ₹19.5 L/yr |
Assistant Manager
520
salaries
| ₹3.8 L/yr - ₹14.8 L/yr |
Manager
284
salaries
| ₹6.2 L/yr - ₹25.5 L/yr |
Civil Engineer
254
salaries
| ₹2 L/yr - ₹7.7 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power