I have over 10 years of experience in QA and QC for civil engineering projects, including overseeing inspections, testing, and ensuring compliance with regulations.
Managed QA/QC activities for various civil engineering projects
Conducted inspections and tests to ensure quality and compliance
Implemented quality control procedures and protocols
Collaborated with project teams to address quality issues and make improvements
...
PT slab stands for post-tensioned slab, a type of concrete slab reinforced with high-strength steel tendons.
PT slab is a type of concrete slab that uses high-strength steel tendons to apply compression after the concrete has hardened.
The tendons are placed in ducts or sleeves within the concrete slab and tensioned after the concrete has cured.
PT slabs are commonly used in large span structures like bridges, parking gar...
Top trending discussions
posted on 11 Sep 2023
Reinforcement checking process involves verifying the placement, size, and spacing of steel bars in concrete structures.
Verify the correct size and grade of reinforcement bars as per design drawings
Check the spacing between bars to ensure they meet the specified requirements
Inspect the placement of bars to ensure they are properly aligned and secured in position
Use tools like measuring tape, rebar locator, and cover me...
I applied via Approached by Company
posted on 1 Jul 2024
posted on 12 Jun 2024
Initial setting time of concrete is the time taken for the concrete to change from a plastic to a solid state.
Initial setting time is typically around 30 minutes to 1.5 hours, depending on the mix design and environmental conditions.
It is important to monitor the initial setting time to ensure proper placement and finishing of the concrete.
Factors affecting initial setting time include temperature, water-cement ratio, ...
posted on 14 Nov 2023
I applied via Naukri.com
J.kumar metro project is a major infrastructure project involving construction of metro rail system.
J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.
The project involves various stages such as planning, design, construction, and implementation.
It may include tasks like excavation, tunneling, track laying, station construction, etc.
The project requires coordination wi...
I applied via Naukri.com and was interviewed in Nov 2023. There were 7 interview rounds.
Compressive strength of cube
All test all tests quality control
Bitumen, Aggregate test, cement test,????
Coding test all questions
All tests quality control in Lab engineering
posted on 14 Feb 2024
posted on 27 Jan 2025
I was interviewed before Jan 2024.
posted on 17 Aug 2023
I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.
It is very difficult test to pass
Interview experience
Deputy Manager
607
salaries
| ₹5.1 L/yr - ₹18 L/yr |
Assistant Manager
570
salaries
| ₹3.8 L/yr - ₹14 L/yr |
Senior Engineer
553
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Civil Engineer
252
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Manager
242
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power