i
Hyundai Motor India Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
Top trending discussions
Transformer protections include overcurrent protection, overvoltage protection, and differential protection.
Overcurrent protection: Protects the transformer from excessive current flow which can lead to overheating and damage.
Overvoltage protection: Prevents the transformer from being damaged by high voltage spikes or surges.
Differential protection: Monitors the difference in current entering and leaving the transforme...
I was interviewed in Mar 2023.
A car engine can have either 2-stroke or 4-stroke.
A 2-stroke engine completes a power cycle in two strokes of the piston, while a 4-stroke engine completes it in four strokes.
Most cars have 4-stroke engines.
The four strokes in a 4-stroke engine are intake, compression, combustion, and exhaust.
I'm sorry, but I don't understand the question. Could you please provide more context?
I applied via Job Fair and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
Related to basic knowledge what you had studied,and basic detsils explanation about that company.
Giving specific topic ..we would explain about that topic
The line leader is responsible for overseeing the operators and ensuring that the production line runs smoothly.
The line leader is the supervisor of the operators.
They ensure that the operators are following safety protocols and production standards.
The line leader communicates with the operators to identify and resolve any issues that arise.
They are responsible for training new operators and ensuring that they are pro...
Improving line output can be achieved through optimizing processes, reducing downtime, and increasing efficiency.
Analyze the production process to identify bottlenecks and inefficiencies
Implement lean manufacturing principles to reduce waste and increase productivity
Invest in automation and technology to streamline processes
Train employees on best practices and provide incentives for meeting production targets
Regularly...
I applied via Company Website and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Feb 2023. There were 2 interview rounds.
Case study about machine break down and productivity
I applied via Naukri.com and was interviewed before Sep 2021. There was 1 interview round.
PMI manufacturing tool breakdown from machine do and dose
PMI manufacturing tool refers to the process of using precision measurement instruments to ensure quality control in manufacturing
Breakdown refers to the process of disassembling the tool for maintenance or repair
Machine do and dose refer to the specific steps involved in the manufacturing process
Understanding the breakdown process is important for ensuring effic...
based on 4 reviews
Rating in categories
Manager
678
salaries
| ₹10 L/yr - ₹27 L/yr |
Assistant Manager
583
salaries
| ₹7 L/yr - ₹19.5 L/yr |
Trainee
438
salaries
| ₹1.2 L/yr - ₹3.8 L/yr |
Diploma Mechanical Engineer
327
salaries
| ₹1.1 L/yr - ₹4.5 L/yr |
Hyundai Diploma Trainee
261
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Maruti Suzuki
Tata Motors
Mahindra & Mahindra
Toyota Kirloskar Motor