i
Gururaj Engineers
Filter interviews by
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
Price , manufactured date,expired date, batch code,production order
Top trending discussions
posted on 12 May 2024
I applied via Job Fair and was interviewed in Apr 2024. There were 2 interview rounds.
Production productivity type refers to the method or approach used to measure and improve productivity in a manufacturing setting.
Different types include labor productivity, machine productivity, and overall equipment effectiveness (OEE).
Labor productivity measures the output per worker or per labor hour.
Machine productivity measures the output per machine or equipment.
OEE measures the overall efficiency of a productio...
Production productivity type refers to the method used to measure and improve efficiency in manufacturing processes.
Different types include OEE (Overall Equipment Effectiveness), Takt time, and Cycle time
OEE measures the percentage of planned production time that is truly productive
Takt time is the rate at which a product must be produced to meet customer demand
Cycle time is the total time it takes to complete a proces
posted on 1 Jul 2022
I applied via Recruitment Consulltant
Interview experience
Purchase Executive
5
salaries
| ₹2.8 L/yr - ₹3.3 L/yr |
Design Engineer
4
salaries
| ₹1.3 L/yr - ₹3.6 L/yr |
Automation Engineer
4
salaries
| ₹1.4 L/yr - ₹4 L/yr |
Electrical Engineer
3
salaries
| ₹1.6 L/yr - ₹1.6 L/yr |
Account Assistant
3
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Larsen & Toubro Limited
Thermax Limited
BHEL
TCS