i
GSPANN Technologies
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
The question covers various topics related to software development and testing.
SDLC stands for Software Development Life Cycle and is a process followed for software development.
STLC stands for Software Testing Life Cycle and is a process followed for software testing.
Agile is a software development methodology that emphasizes on iterative and incremental development.
Different types of testing include unit testing, int...
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Quantitative ability and logical ability
I am proficient in Java and Python.
Strong understanding of object-oriented programming concepts
Experience with Java frameworks such as Spring and Hibernate
Proficient in Python libraries such as NumPy and Pandas
Program to print HCF of numbers as output
Take input of two numbers from user
Find the smaller number between the two
Run a loop from 1 to the smaller number
Check if both numbers are divisible by the current loop variable
If yes, update the HCF variable
Print the HCF as output
I appeared for an interview in Sep 2020.
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
Multiple choice questions
I appeared for an interview before Oct 2021.
A nested list is a list that contains other lists as its elements.
Nested lists can be created using square brackets and separating the elements with commas.
Elements of a nested list can be accessed using indexing and slicing.
Example: my_list = [[1, 2, 3], [4, 5, 6], [7, 8, 9]]
Accessing element 5: my_list[1][1]
A queue is a data structure that follows the First In First Out (FIFO) principle.
Elements are added to the back of the queue and removed from the front.
Example: A line of people waiting for a movie ticket.
Operations: Enqueue (add element to back), Dequeue (remove element from front), Peek (view front element)
posted on 13 Dec 2021
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Software Engineer
445
salaries
| ₹7.2 L/yr - ₹25.3 L/yr |
Technical Lead
376
salaries
| ₹10 L/yr - ₹31 L/yr |
Software Engineer
287
salaries
| ₹4 L/yr - ₹16.1 L/yr |
Senior Technical Lead
138
salaries
| ₹13.6 L/yr - ₹32.8 L/yr |
Associate Software Engineer
103
salaries
| ₹2 L/yr - ₹9 L/yr |
Xoriant
Photon Interactive
CitiusTech
Iris Software