Q1. What is the basic difference in Procurement and Post ordering
Procurement is the process of acquiring goods or services, while post-ordering involves activities after the order has been placed.
Procurement involves identifying the need for goods or services, selecting suppliers, negotiating contracts, and placing orders.
Post-ordering involves activities such as tracking the order, receiving and inspecting the goods, processing invoices, and resolving any issues that may arise.
Procurement is a proactive process, while post-ordering is rea...read more
Q2. Details of crystallization, evaporation & pumps
Crystallization, evaporation, and pumps are all important processes in chemical engineering.
Crystallization is the process of forming solid crystals from a solution or melt.
Evaporation is the process of removing liquid from a solution to concentrate it.
Pumps are used to move fluids through a system, such as in a distillation column.
Different types of pumps include centrifugal pumps, positive displacement pumps, and diaphragm pumps.
Q3. How will you handle the vendors with poor response
I will communicate with them to understand the reason for poor response and work towards finding a solution.
Initiate a conversation with the vendor to understand the reason for poor response
Identify the areas where the vendor is facing challenges and work towards finding a solution
Set clear expectations and timelines for future communication and follow-up
Consider alternative vendors if the poor response persists despite efforts to resolve the issue
Q4. Reduce routine Maintenance & Increase planned maintenance
To reduce routine maintenance and increase planned maintenance, focus on preventive maintenance strategies, implement predictive maintenance technologies, prioritize critical assets, and improve scheduling and resource allocation.
Implement a preventive maintenance program to address issues before they become costly breakdowns.
Utilize predictive maintenance technologies such as sensors and data analytics to anticipate equipment failures.
Prioritize critical assets that have the...read more
Q5. Explain any troubleshooting activity
Troubleshooting involves identifying and resolving problems in a system or process.
Identify the problem and gather information about it
Develop and test hypotheses to determine the cause of the problem
Implement a solution and test to ensure it resolves the problem
Document the troubleshooting process and solution for future reference
Q6. Turbine Over hauling activities
Turbine overhauling activities involve disassembling, inspecting, repairing, and reassembling turbine components to ensure optimal performance.
Turbine overhauling is a critical maintenance activity to ensure the efficient operation of turbines.
It involves disassembling the turbine to inspect and assess the condition of components.
Repairs or replacements are made as necessary to address any issues found during inspection.
After repairs, the turbine is reassembled and tested to ...read more
Q7. Plant load factor
Plant load factor is a measure of the actual output of a power plant compared to its maximum possible output.
Plant load factor is calculated by dividing the actual energy generated by the plant over a specific period by the maximum possible energy that could have been generated during the same period.
It is expressed as a percentage and indicates how efficiently a power plant is being utilized.
A high plant load factor indicates that the plant is being operated efficiently, whi...read more