I applied via Referral and was interviewed before May 2023. There were 2 interview rounds.
Improving power factor involves reducing reactive power consumption and increasing the efficiency of the system.
Install power factor correction capacitors to offset reactive power
Upgrade to more efficient equipment to reduce reactive power consumption
Implement power factor correction techniques such as phase-shifting transformers
Regularly monitor and maintain power factor levels to ensure efficiency
Educate staff on the
Different types of relays used in a substation include protective relays, auxiliary relays, and control relays.
Protective relays are used to detect abnormal conditions in the power system and initiate corrective actions.
Auxiliary relays are used for auxiliary functions such as interlocking, signaling, and indication.
Control relays are used to control the operation of various equipment in the substation.
Examples of rela...
What will you do when your breaker is not tripping?
Top trending discussions
Interview experience
Assistant Manager
34
salaries
| ₹1.9 L/yr - ₹7 L/yr |
Project Manager
30
salaries
| ₹3 L/yr - ₹9 L/yr |
Site Engineer
14
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Production Engineer
13
salaries
| ₹2.1 L/yr - ₹4.5 L/yr |
Quality Engineer
13
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Kirloskar Brothers
Ksb Pumps
WPIL
Shakti Pumps