Filter interviews by
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
My current work involves overseeing the flow process of manufacturing operations to ensure efficiency and quality.
Analyze current manufacturing processes to identify areas for improvement
Implement lean manufacturing principles to streamline production flow
Collaborate with cross-functional teams to optimize workflow
Utilize process mapping tools to visualize and improve process flow
Monitor key performance indicators to t
CNC machines use computerized controls to operate and manipulate tools for precision machining.
CNC machines follow instructions from a computer program to move the cutting tool in precise patterns.
They can perform complex cuts and shapes with high accuracy and repeatability.
Common types include CNC milling machines, lathes, and routers.
Examples of CNC machine manufacturers include Haas, Mazak, and Fanuc.
Top trending discussions
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
I applied via Times Job and was interviewed before Dec 2020. There were 3 interview rounds.
Takt time is the rate at which a product must be produced to meet customer demand. Cycle time is the time it takes to complete one cycle of a process.
Takt time is calculated by dividing the available production time by the customer demand.
Cycle time is the time it takes to complete one unit of a product.
Cycle time can be used to identify bottlenecks in the production process.
Reducing cycle time can increase productivit...
Line balancing is the process of optimizing workloads across an assembly line to improve efficiency and productivity.
Identify the tasks required to complete the assembly process
Determine the cycle time for each task
Calculate the total available work time
Allocate tasks to workstations based on cycle time and available work time
Adjust the allocation to minimize idle time and maximize efficiency
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
I am a Senior Engineer with 10+ years of experience in software development, specializing in backend systems and database management.
10+ years of experience in software development
Specialize in backend systems and database management
Strong problem-solving skills
Experience with various programming languages such as Java, Python, and SQL
I appeared for an interview before Jun 2021.
DCA and PLC are commonly used acronyms in the field of engineering.
DCA stands for Direct Current Amplifier, which is a device used to amplify direct current signals.
PLC stands for Programmable Logic Controller, which is a digital computer used for automation of electromechanical processes.
DCA and PLC are essential components in various engineering applications such as industrial automation and control systems.
based on 1 interview
Interview experience
Junior Engineer
52
salaries
| ₹2.6 L/yr - ₹4.9 L/yr |
Senior Design Engineer
31
salaries
| ₹5.6 L/yr - ₹10.6 L/yr |
Design Engineer
30
salaries
| ₹2.8 L/yr - ₹9 L/yr |
Senior Engineer
30
salaries
| ₹4.5 L/yr - ₹11.5 L/yr |
Manager
22
salaries
| ₹10 L/yr - ₹16 L/yr |
John Deere
KONE
Caterpillar Inc
TÜV SÜD