Upload Button Icon Add office photos

Filter interviews by

Fibrex Construction group HSE Engineer Interview Questions and Answers

Updated 3 Sep 2024

Fibrex Construction group HSE Engineer Interview Experiences

1 interview found

HSE Engineer Interview Questions & Answers

user image Anonymous

posted on 3 Sep 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Responsiblities of HSE engineer
  • Ans. 

    HSE engineers are responsible for ensuring health, safety, and environmental regulations are followed in the workplace.

    • Developing and implementing health and safety policies and procedures

    • Conducting risk assessments and identifying potential hazards

    • Training employees on safety protocols and emergency procedures

    • Investigating accidents and incidents to determine root causes and prevent future occurrences

    • Ensuring complian...

  • Answered by AI

Interview questions from similar companies

I applied via Approached by Company and was interviewed before May 2018. There were 2 interview rounds.

Interview Preparation Tips

General Tips: Please don't go anyone in Emcure it is very worst organization for job satisfaction.
Some time you think all is well this job is good ad then suddenly security guard come and tell you organization don't require you any more please go home....
Skills: Communication
Duration: <1 week

I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1.  How you will design facility,What necessary things you will consider during designing .
  • Ans. 

    I will consider the purpose, size, location, budget, safety, accessibility, and sustainability while designing the facility.

    • Identify the purpose of the facility

    • Determine the size and location based on the purpose and target audience

    • Allocate budget for construction, equipment, and maintenance

    • Ensure safety measures are in place for employees and visitors

    • Make the facility accessible for people with disabilities

    • Incorporate...

  • Answered by AI
  • Q2. Tunnel zone wise diffential pressure and what are the limits
  • Ans. 

    Tunnel zone differential pressure refers to the pressure difference between different zones in a tunnel.

    • Tunnel zone differential pressure is important for maintaining proper ventilation and air flow in tunnels.

    • It is measured using pressure sensors installed in different zones of the tunnel.

    • The limits for tunnel zone differential pressure depend on the specific tunnel and its ventilation requirements.

    • Excessive different...

  • Answered by AI
  • Q3. Water consumption in one vial washing cycle.?
  • Ans. 

    The water consumption in one vial washing cycle varies depending on the specific washing machine and cycle settings.

    • Water consumption can range from a few milliliters to several liters per cycle.

    • Factors that influence water consumption include the size and type of vials being washed, the washing machine's capacity, and the cycle duration.

    • For example, a small vial washing machine may use around 100 milliliters of water ...

  • Answered by AI
  • Q4. How you calculate block capacity?
  • Ans. 

    Block capacity is calculated by multiplying the length, width, and height of the block.

    • Measure the length, width, and height of the block

    • Multiply the length, width, and height together

    • The resulting number is the block capacity

  • Answered by AI
  • Q5. If purified or WFI water conductivity goes beyond the limit what you will do??
  • Ans. 

    I will take corrective actions to bring the conductivity within the limit.

    • Stop the water system and investigate the root cause of the high conductivity

    • Check the calibration of the conductivity meter

    • Inspect the water purification system for any malfunctioning components

    • Take appropriate corrective actions to bring the conductivity within the limit

    • Re-test the water to ensure it meets the required specifications

  • Answered by AI
  • Q6. How you will calculate heat load??
  • Ans. 

    Heat load is calculated by considering factors such as the size of the space, insulation, and equipment used.

    • Determine the size of the space in square feet

    • Determine the insulation type and thickness

    • Identify the equipment used and its power consumption

    • Calculate the heat generated by occupants and lighting

    • Add up all the factors to determine the total heat load

  • Answered by AI
  • Q7. How you will reduce breakdown??
  • Ans. 

    I will reduce breakdown by implementing preventive maintenance and regular inspections.

    • Implementing a preventive maintenance program

    • Regular inspections of equipment and machinery

    • Training employees on proper use and maintenance of equipment

    • Using high-quality parts and materials

    • Monitoring equipment performance and addressing issues promptly

  • Answered by AI
  • Q8. How you will decide PM schedule of any equipment.
  • Ans. 

    I will consider manufacturer's recommendations, equipment usage, and maintenance history to decide PM schedule.

    • Review manufacturer's recommendations for maintenance schedule

    • Consider equipment usage and workload

    • Analyze maintenance history and identify any recurring issues

    • Consult with maintenance team and other stakeholders

    • Create a PM schedule that balances maintenance needs with operational requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - - Be confident during interview.
- Wear formal dress
- Introduce your self short and sweet
- Prepare your self befor going for the interview.

I applied via Recruitment Consulltant and was interviewed in Sep 2021. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.
Round 2 - One-on-one 

(1 Question)

  • Q1. About myself, Few technical questions, MDM process

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall it's good and fast response
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(1 Question)

  • Q1. Latest brand work. Hands on experience with day to day jobs
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Basic question on past experience and estimation questions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions related to your previous experience
Round 3 - HR 

(2 Questions)

  • Q1. Reason for change
  • Q2. Salary discussion
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Autoclave , Vail washing and Tunnel, Manufacturing, Filling and Sealing and Terminal sterilizer Related Question based on your Resume.

I applied via Naukri.com and was interviewed before May 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. SQL Joins
  • Q2. Swap 2 numbers without 3rd variable
  • Ans. 

    Swapping two numbers without using a third variable

    • Use arithmetic operations to swap the values

    • Add the two numbers and store the result in the first variable

    • Subtract the second number from the result and store it in the second variable

    • Subtract the second variable from the first variable to get the original value of the second variable

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1st Round : Long set of Aptitude questions
2nd Round : Technical Interview
3rd Round : Technical Interview and HR questions

Skills evaluated in this interview

I applied via Campus Placement and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Your work ex
  • Q2. Mould it as you are presenting in the front of the client
  • Ans. 

    The question is asking how I would present myself in front of a client.

    • I would dress professionally and appropriately for the meeting

    • I would prepare a clear and concise presentation that addresses the client's needs and concerns

    • I would maintain eye contact and engage with the client throughout the meeting

    • I would listen actively to the client's feedback and respond appropriately

    • I would be respectful and courteous at all

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be real and always be positive.
They wanted to see whether you can work on pressure or not

Fibrex Construction group Interview FAQs

How many rounds are there in Fibrex Construction group HSE Engineer interview?
Fibrex Construction group interview process usually has 1 rounds. The most common rounds in the Fibrex Construction group interview process are One-on-one Round.

Tell us how to improve this page.

Fibrex Construction group HSE Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Kantar Interview Questions
3.5
 • 98 Interviews
Aptara Interview Questions
3.3
 • 63 Interviews
Pole To Win Interview Questions
3.4
 • 58 Interviews
Xdbs Interview Questions
3.1
 • 39 Interviews
View all
HSE Officer
5 salaries
unlock blur

₹12 L/yr - ₹12.1 L/yr

Senior Quantity Surveyor
3 salaries
unlock blur

₹32.4 L/yr - ₹36.1 L/yr

QA QC Engineer
3 salaries
unlock blur

₹4 L/yr - ₹13 L/yr

HSE Engineer
3 salaries
unlock blur

₹0.7 L/yr - ₹8 L/yr

Explore more salaries
Compare Fibrex Construction group with

Emcure Pharmaceuticals

3.7
Compare

Kantar

3.5
Compare

Aptara

3.3
Compare

Times Group

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview