Asked inETA Engineering,BNS HVAC system operator in contract basis

How chilled water requried and on which postion detection and derction required to installation the colling tower and size of ton required of hp motar and fin requried and how much kg water

Be the first one to answer
Add answer anonymously...

Top ETA Engineering BNS HVAC system operator in contract basis interview questions & answers

ETA Engineering BNS HVAC system operator in contract basis Interview Questions
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter