ETA Engineering
Pioneer Technosoft Interview Questions and Answers
Q1. Ahu and fcu chiller chilled water system actoior system of hvac water bslancring expansion tank sir vent screw recocovopting composition of compression system electrical cenrtfuga pump of high and low primary a...
read moreQ2. How chilled water requried and on which postion detection and derction required to installation the colling tower and size of ton required of hp motar and fin requried and how much kg water
Q3. All HVAC system work done.
I have experience in all aspects of HVAC system work, including installation, maintenance, and repair.
Installation of HVAC systems
Maintenance of HVAC systems
Repair of HVAC systems
Knowledge of HVAC controls and automation
Familiarity with HVAC equipment and tools
Experience with HVAC load calculations and system design
Understanding of HVAC codes and regulations
Ability to troubleshoot HVAC issues
Experience with refrigeration systems
Knowledge of indoor air quality and ventilation ...read more
Q4. Ahu dystem ton how to find of hp motar sir supply duct and return sernght to ahu return
Q5. TRANSFORMER PRINCIPLES
Transformer principles involve the transfer of electrical energy from one circuit to another through electromagnetic induction.
Transformers are used to step up or step down voltage levels in power transmission and distribution systems.
They work on the principle of Faraday's law of electromagnetic induction.
Transformers have two coils, a primary coil and a secondary coil, which are wound around a common magnetic core.
The primary coil is connected to the input voltage source, w...read more
Q6. Water cooling towers definition
Q7. Of hvac high dide and low side
Interview Process at Pioneer Technosoft
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month