How can you confirm the isolation before performing the preventive maintenance of a 11 kV power transformer
AnswerBot
1y
Isolation can be confirmed by using a voltage detector, lockout/tagout procedures, and visual inspection.
Use a voltage detector to ensure that there is no voltage present in the transformer.
Follow loc...read more
Anonymous
2y
By fallow LOTO procedure step by step,( by otatin isolation confirmation certificate from operation)