Add office photos
Employer?
Claim Account for FREE

Emcure Pharmaceuticals

3.7
based on 1.9k Reviews
Filter interviews by

Sky Dreamers Club Interview Questions and Answers

Updated 5 Feb 2024
Popular Designations

Q1. How you will design facility,What necessary things you will consider during designing .

Ans.

I will consider the purpose, size, location, budget, safety, accessibility, and sustainability while designing the facility.

  • Identify the purpose of the facility

  • Determine the size and location based on the purpose and target audience

  • Allocate budget for construction, equipment, and maintenance

  • Ensure safety measures are in place for employees and visitors

  • Make the facility accessible for people with disabilities

  • Incorporate sustainable features to reduce environmental impact

  • Consid...read more

View 2 more answers

Q2. If purified or WFI water conductivity goes beyond the limit what you will do??

Ans.

I will take corrective actions to bring the conductivity within the limit.

  • Stop the water system and investigate the root cause of the high conductivity

  • Check the calibration of the conductivity meter

  • Inspect the water purification system for any malfunctioning components

  • Take appropriate corrective actions to bring the conductivity within the limit

  • Re-test the water to ensure it meets the required specifications

Add your answer

Q3. Water consumption in one vial washing cycle.?

Ans.

The water consumption in one vial washing cycle varies depending on the specific washing machine and cycle settings.

  • Water consumption can range from a few milliliters to several liters per cycle.

  • Factors that influence water consumption include the size and type of vials being washed, the washing machine's capacity, and the cycle duration.

  • For example, a small vial washing machine may use around 100 milliliters of water per cycle, while a larger industrial machine may use sever...read more

View 2 more answers

Q4. Tunnel zone wise diffential pressure and what are the limits

Ans.

Tunnel zone differential pressure refers to the pressure difference between different zones in a tunnel.

  • Tunnel zone differential pressure is important for maintaining proper ventilation and air flow in tunnels.

  • It is measured using pressure sensors installed in different zones of the tunnel.

  • The limits for tunnel zone differential pressure depend on the specific tunnel and its ventilation requirements.

  • Excessive differential pressure can indicate issues with the ventilation syst...read more

View 1 answer
Discover Sky Dreamers Club interview dos and don'ts from real experiences

Q5. How you will decide PM schedule of any equipment.

Ans.

I will consider manufacturer's recommendations, equipment usage, and maintenance history to decide PM schedule.

  • Review manufacturer's recommendations for maintenance schedule

  • Consider equipment usage and workload

  • Analyze maintenance history and identify any recurring issues

  • Consult with maintenance team and other stakeholders

  • Create a PM schedule that balances maintenance needs with operational requirements

Add your answer

Q6. How you will calculate heat load??

Ans.

Heat load is calculated by considering factors such as the size of the space, insulation, and equipment used.

  • Determine the size of the space in square feet

  • Determine the insulation type and thickness

  • Identify the equipment used and its power consumption

  • Calculate the heat generated by occupants and lighting

  • Add up all the factors to determine the total heat load

Add your answer

Q7. How you calculate block capacity?

Ans.

Block capacity is calculated by multiplying the length, width, and height of the block.

  • Measure the length, width, and height of the block

  • Multiply the length, width, and height together

  • The resulting number is the block capacity

Add your answer

Q8. How you will reduce breakdown??

Ans.

I will reduce breakdown by implementing preventive maintenance and regular inspections.

  • Implementing a preventive maintenance program

  • Regular inspections of equipment and machinery

  • Training employees on proper use and maintenance of equipment

  • Using high-quality parts and materials

  • Monitoring equipment performance and addressing issues promptly

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Manager Interview Questions from Similar Companies

3.7
 • 37 Interview Questions
3.9
 • 24 Interview Questions
3.4
 • 15 Interview Questions
3.8
 • 14 Interview Questions
4.0
 • 13 Interview Questions
4.1
 • 12 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter