M25 is a grade of concrete with a compressive strength of 25 megapascals after 28 days of curing.
M25 is a mix of concrete with a ratio of 1:1:2 (cement:sand:aggregate).
It is commonly used for residential construction, pavements, and small-scale projects.
The strength of M25 concrete is achieved after 28 days of curing.
It is important to follow proper mixing and curing procedures to achieve the desired strength.
To make a BOQ for larger construction work, one must accurately estimate quantities of materials and labor required for each aspect of the project.
Break down the project into smaller components such as foundation, superstructure, finishes, etc.
Calculate the quantities of materials needed for each component based on the project drawings and specifications.
Estimate the labor hours required for each component based on the...
posted on 2 Feb 2024
I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.
Mirror images, quantitative aptitude
Modern dam in 2023 time: 15 minutes for 8 people
Rankine cycle is a thermodynamic cycle used in power plants to convert heat into mechanical work.
Rankine cycle is a theoretical cycle that represents the operation of a steam power plant.
It consists of four processes: heating, expansion, cooling, and compression.
The cycle uses a working fluid, typically water or steam, to transfer heat and perform work.
The heat source is usually a boiler where fuel is burned to produce...
Runner power is the amount of work done by a runner in a given time. Impulse momentum principle states that the change in momentum of an object is equal to the impulse applied to it.
Runner power is a measure of how much work a runner can do in a specific time period.
It is calculated by dividing the work done by the time taken.
For example, if a runner completes a 10 km race in 1 hour, their power can be calculated by di...
posted on 21 Jul 2023
posted on 27 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 14 May 2024
I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.
I applied via Job Portal and was interviewed in Dec 2022. There were 2 interview rounds.
Troubles with pre-operation planning in project management model
Ensure clear communication and alignment with stakeholders
Identify potential risks and develop contingency plans
Establish a detailed timeline and allocate resources effectively
Regularly monitor progress and adjust plans as needed
Implementing a project management model involves defining project goals, creating a timeline, assigning tasks, monitoring progress, and evaluating outcomes.
Define project goals and objectives clearly
Create a project timeline with milestones
Assign tasks to team members based on their skills and expertise
Monitor progress regularly and make adjustments as needed
Evaluate outcomes to identify areas for improvement
Examples:
based on 5 reviews
Rating in categories
Assistant Manager
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager HR
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Dhampur Sugar Mills
Triveni Engineering & Industries
Dwarikesh Sugar Industries
EID Parry (India)