Welding specification includes details on materials, welding process, joint design, and quality requirements.
Welding specification outlines the materials to be welded together.
It specifies the welding process to be used, such as MIG, TIG, or stick welding.
Joint design details, such as groove type and dimensions, are included in the specification.
Quality requirements for the weld, such as visual inspection or non-destru...
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
5S is a workplace organization method that aims to improve efficiency and productivity by eliminating waste and maintaining cleanliness.
Sort: separate necessary items from unnecessary ones
Set in order: arrange necessary items in a logical and efficient manner
Shine: clean and inspect the work area regularly
Standardize: establish procedures and guidelines for maintaining the first three S's
Sustain: ensure that the first
There are various types of welding such as MIG, TIG, Stick, and Flux-cored welding. Welding wire specifications include diameter, material, and AWS classification.
MIG welding uses a wire electrode and a shielding gas to join two metal pieces together.
TIG welding uses a tungsten electrode and a filler metal to create a weld.
Stick welding uses a consumable electrode coated in flux to create a weld.
Flux-cored welding uses...
Material management is the process of planning, organizing, and controlling the flow of materials from acquisition to disposal.
It involves inventory management, procurement, storage, and distribution of materials.
Effective material management ensures timely availability of materials while minimizing inventory costs.
It also involves tracking and monitoring the usage of materials to prevent wastage and optimize resource ...
I applied via Naukri.com and was interviewed before Oct 2020. There were 7 interview rounds.
Paint Shop process involves preparing, painting, and curing the surface of a product.
The surface is first cleaned and prepared for painting
A primer is applied to improve adhesion and corrosion resistance
The topcoat is applied in multiple layers for desired color and finish
The painted surface is then cured in an oven or air-dried
Quality checks are performed throughout the process to ensure consistency and durability
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality metrics.
OEE stands for Overall Equipment Effectiveness
It is calculated by multiplying availability, performance, and quality percentages
OEE helps identify areas for improvement in manufacturing processes
Example: If a machine has 90% availability, 95% performance, and 98% quality, its OEE would be 83.79%
OEE is...
Poka yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.
Poka yoke is a Japanese term meaning 'mistake-proofing' or 'error-proofing'. It involves designing a process or system in a way that prevents mistakes or errors from occurring.
Poka yoke techniques can include using sensors, alarms, or physical devices to detect and prevent errors.
For example, a poka ...
Production is the process of creating goods or services, while productivity is the measure of efficiency in producing those goods or services.
Production refers to the creation of goods or services, while productivity measures the efficiency of that production.
Production is a process, while productivity is a measure.
Production can be increased by adding more resources, while productivity can be increased by improving pr...
TPM stands for Total Productive Maintenance and JH stands for Job Hazard Analysis. JH 7 steps are the steps involved in conducting a JH analysis.
TPM is a maintenance strategy aimed at maximizing the productivity of equipment and minimizing downtime.
JH is a safety analysis technique used to identify potential hazards in a job or task.
JH 7 steps involve breaking down a job into steps, identifying potential hazards, deter...
Check sheet is a tool used to collect and analyze data. WSQC, SWC, and WES are not commonly used acronyms in relation to production engineering.
Check sheet is a simple data collection tool used to track defects or issues in a process
WSQC, SWC, and WES are not commonly used acronyms in production engineering
However, there are similar tools like the 5S methodology or the DMAIC process for continuous improvement
7QC tools check sheet is a document used to collect and analyze data, while Pareto diagram is a graphical representation of the data.
7QC tools check sheet is used to identify and solve problems in production processes
It helps in collecting and analyzing data related to the process
Pareto diagram is a bar graph that shows the relative frequency or size of problems in descending order of importance
It helps in identifying ...
Rejection handling is the process of identifying and addressing rejected products. Red bin analysis is a method of analyzing rejected products to determine the cause of rejection.
Rejection handling involves identifying and segregating rejected products
Red bin analysis involves analyzing rejected products to determine the root cause of rejection
The data collected during red bin analysis can be used to improve production...
Manpower handling refers to managing and organizing the workforce in a production environment.
It involves recruiting, training, and scheduling employees
Ensuring safety and compliance with regulations
Motivating and supervising workers
Optimizing productivity and efficiency
Dealing with conflicts and resolving issues
Examples include managing a production line, overseeing a team of technicians, or coordinating shifts in a f
Kaizen is a Japanese term for continuous improvement while CAPA stands for Corrective and Preventive Action.
Kaizen involves making small, incremental improvements to processes and systems over time.
CAPA is a process used to identify and address the root cause of a problem or nonconformity.
Kaizen and CAPA are both important tools for improving quality and efficiency in manufacturing and other industries.
Examples of kaiz...
Efficiency in production engineering refers to the ratio of output to input.
Efficiency is a measure of how well resources are utilized in the production process.
It is calculated as the ratio of output to input.
Higher efficiency means more output is produced with the same amount of input.
Efficiency can be improved by optimizing processes, reducing waste, and increasing automation.
For example, reducing the time it takes ...
4m changing formats refers to the process of changing the format of a production line from one product to another.
It involves reconfiguring the machinery and equipment to accommodate the new product
It may require changing the packaging, labeling, and other materials used in the production process
It is a common practice in manufacturing to increase efficiency and flexibility
Example: Changing a production line from makin
KPI instruction refers to the guidelines or rules that define how key performance indicators (KPIs) should be measured and reported.
KPI instruction provides a framework for measuring and reporting KPIs consistently and accurately.
It outlines the specific metrics that should be tracked and how they should be calculated.
KPI instruction also includes guidelines for setting targets and benchmarks for KPIs.
Examples of KPI i...
ISO-TS audit is a quality management system audit for automotive industry.
ISO-TS audit is a quality management system audit for automotive industry
It is based on ISO 9001 standard and specific requirements for automotive industry
It focuses on ensuring product quality, safety, and customer satisfaction
It involves auditing the entire production process from design to delivery
Examples of ISO-TS audit include audits of car
Line and machining processing are methods used in manufacturing to produce products efficiently and accurately.
Line processing involves a series of steps in which a product is assembled or produced in a linear fashion.
Machining processing involves the use of machines to shape and cut materials into specific shapes and sizes.
Both methods are used to increase efficiency and accuracy in manufacturing processes.
Examples of...
I applied via Company Website and was interviewed in Jul 2024. There were 2 interview rounds.
Expectations with overall experience include continuous learning, growth, leadership opportunities, and contributing to the success of the organization.
Continuous learning and skill development through challenging projects
Opportunities for growth and advancement within the company
Leadership roles and responsibilities to showcase expertise and mentor others
Contributing to the success of the organization through innovati
posted on 20 May 2023
A day to day production report is a summary of the production activities and performance for a given day.
The report should include the quantity of products produced, the number of defects, and any downtime experienced.
It should also highlight any issues encountered during production and the steps taken to resolve them.
The report should be concise and easy to understand, with clear charts and graphs to illustrate the da...
5S implementation is a lean methodology for workplace organization and efficiency.
Sort: Remove unnecessary items from the workplace
Set in order: Organize remaining items in a logical manner
Shine: Clean and maintain the workplace
Standardize: Establish procedures for maintaining the 5S system
Sustain: Continuously improve and maintain the system
Example: Implementing 5S in a manufacturing plant to reduce waste and improve ...
I have strong decision-making skills and can make informed decisions quickly.
I gather all necessary information before making a decision
I consider the potential outcomes and consequences of each option
I prioritize and weigh the importance of each factor
I am confident in my ability to make decisions under pressure
For example, in my previous role as a Production Supervisor, I had to make quick decisions when a machine br...
Basic aptitude and Maths questions
Data Structures and algorithms
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
General maintenance of concrete pumps involves regular inspection, cleaning, lubrication, and replacement of worn-out parts.
Inspect the pump regularly for any signs of wear and tear, leaks, or damage.
Clean the pump after every use to prevent buildup of concrete residue.
Lubricate the moving parts of the pump to ensure smooth operation.
Replace any worn-out or damaged parts as soon as possible to prevent further damage.
Fo...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Service Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Service Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Schwing Stetter
Putzmeister India
Conmat Heavy Industries Pvt Ltd
Ajax Fiori Engineering