If there is a load of 50000 on the floor and work at 250 per hour rate, how many associates will be required for it?

AnswerBot
5mo

To calculate the number of associates required for a load of 50000 at a rate of 250 per hour.

  • Calculate the total work required: 50000 / 250 = 200 hours

  • Determine the number of associates needed based o...read more