Holding and testing timings.
Anonymous
1y
For after meter testing timing depends for 5 to 30 minutes at 130 mbar and before meter testing timing would be 2.2 kg/cm2 for 2 hours.
Manvir Singh
author
3y
Holding to be done for 24 hrs at 4.2 mili baar in riser.