Filter interviews by
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
Soil stabilization is the process of improving the engineering properties of soil to enhance its strength and durability.
It involves adding or mixing materials with the soil to alter its physical and chemical properties.
Common materials used for soil stabilization include cement, lime, fly ash, and bitumen.
Soil stabilization can be used to increase the load-bearing capacity of soil, reduce settlement, control erosion, ...
Soil stabilization is the process of improving the engineering properties of soil to increase its strength and durability.
It involves adding materials to the soil to enhance its properties.
Common materials used for soil stabilization include cement, lime, and fly ash.
Soil stabilization is commonly used in road construction to improve the load-bearing capacity of the soil.
It can also be used in the construction of found...
Top trending discussions
The duration of Vishwa Samudra Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 57 interviews
Interview experience
based on 306 reviews
Rating in categories
Junior Engineer
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Thermax Limited