Upload Button Icon Add office photos

Utility Powertech

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Utility Powertech Power Plant Technician Interview Questions and Answers

Updated 6 May 2023

Utility Powertech Power Plant Technician Interview Experiences

1 interview found

Power Plant Technician Interview Questions & Answers

user image pankaj kumar gupta

posted on 6 May 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Apr 2023.

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Solar Project Related how can Check Insulation and which Divice.
  • Q2. What is SCADA
  • Ans. 

    SCADA stands for Supervisory Control and Data Acquisition. It is a system used for monitoring and controlling industrial processes.

    • SCADA systems are used in various industries such as oil and gas, water treatment, and manufacturing.

    • They consist of hardware and software components that collect and analyze data from sensors and other devices.

    • SCADA systems allow operators to remotely monitor and control processes, making ...

  • Answered by AI

Skills evaluated in this interview

I applied via Job Fair

Interview Questionnaire 

2 Questions

  • Q1. Whatis the dol strater
  • Ans. 

    DOL starter is a direct online starter used to start and stop the motor instantly.

    • DOL stands for Direct Online.

    • It is used to start and stop the motor instantly.

    • It is the simplest and cheapest method of starting a motor.

    • It consists of a contactor, overload relay, and start and stop push buttons.

    • It is used for small motors up to 5 horsepower.

    • It is not suitable for large motors as it causes a high starting current.

    • Example...

  • Answered by AI
  • Q2. Dol is direct online strater

Interview Preparation Tips

Interview preparation tips for other job seekers - Kindly ask candidates language also provide good facilities.

Interview Questionnaire 

1 Question

  • Q1. Electrical
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Apr 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Electrical technician, LT or HT panel and motors. Transformers working or its Maintenance. House wiring and starter panel wiring.
  • Q2. Maintenance work in power plant
  • Ans. 

    Maintenance work in power plant involves regular inspections, repairs, and upgrades to ensure smooth operation and safety.

    • Regularly inspecting equipment for signs of wear and tear

    • Performing routine maintenance tasks such as lubricating moving parts

    • Repairing faulty equipment to prevent breakdowns

    • Upgrading systems to improve efficiency and safety

    • Following safety protocols to prevent accidents

    • Keeping detailed records of m

  • Answered by AI
  • Q3. All types of electrical equipment.
  • Ans. 

    All types of electrical equipment refer to a wide range of devices used for generating, transmitting, and distributing electricity.

    • Generators: devices that convert mechanical energy into electrical energy

    • Transformers: devices that change the voltage of electricity for transmission

    • Switchgear: equipment used to control, protect, and isolate electrical circuits

    • Cables and wires: used for transmitting electricity from one p...

  • Answered by AI

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - This field practical knowledge and theory knowledge very important.

I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Struggle any field and good knowlage or hard labour

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical engineering others

Interview Preparation Tips

Interview preparation tips for other job seekers - Only for power related companies not any other job profile
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2023. There was 1 interview round.

Contribute & help others!
anonymous
You can choose to be anonymous

Utility Powertech Interview FAQs

How many rounds are there in Utility Powertech Power Plant Technician interview?
Utility Powertech interview process usually has 4 rounds. The most common rounds in the Utility Powertech interview process are Technical and Resume Shortlist.
What are the top questions asked in Utility Powertech Power Plant Technician interview?

Some of the top questions asked at the Utility Powertech Power Plant Technician interview -

  1. Any FITTER TRADE theory questi...read more
  2. Any FITTER theory questi...read more

Recently Viewed

INTERVIEWS

GE Vernova T&D India

No Interviews

INTERVIEWS

Utility Powertech

No Interviews

SALARIES

Maharashtra State Electricity Distribution Company

INTERVIEWS

Kerala State Electricity Board

No Interviews

INTERVIEWS

Kerala State Electricity Board

No Interviews

INTERVIEWS

SAEL Industries Limited

No Interviews

COMPANY BENEFITS

Maharashtra State Electricity Distribution Company

No Benefits

INTERVIEWS

Adani Group

No Interviews

INTERVIEWS

Kerala State Electricity Board

No Interviews

INTERVIEWS

Kerala State Electricity Board

No Interviews

Tell us how to improve this page.

Utility Powertech Power Plant Technician Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 420 Interviews
Thermax Limited Interview Questions
4.1
 • 252 Interviews
ABB Interview Questions
4.1
 • 236 Interviews
Adani Power Interview Questions
3.9
 • 221 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
ReNew Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.2
 • 83 Interviews
View all
Engineer
85 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
53 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
44 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Engineer
40 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Utility Powertech with

BHEL

4.1
Compare

Thermax Limited

4.1
Compare

Siemens

4.1
Compare

ABB

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview