Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.
Top trending discussions
Static keyword is used in programming to declare variables, methods, or classes that belong to the class itself rather than instances of the class.
Static variables are shared among all instances of a class
Static methods can be called without creating an instance of the class
Static classes cannot be instantiated and are used for grouping related methods or constants
Static keyword is also used in C to declare functions t
I applied via Cutshort. and was interviewed in Oct 2019. There was 1 interview round.
posted on 16 Nov 2022
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
posted on 16 Jan 2024
I applied via Recruitment Consulltant and was interviewed before Jan 2023. There were 3 interview rounds.
Aggregating EVs refers to the process of collecting and analyzing data from electric vehicles.
Aggregating EVs involves gathering data from multiple electric vehicles.
This data can include information on battery usage, charging patterns, and performance metrics.
By analyzing aggregated EV data, insights can be gained to improve EV technology and infrastructure.
For example, aggregating EV data can help identify areas wher...
posted on 11 Feb 2025
I was interviewed in Jan 2025.
General knowledge and technical questions.
I have extensive experience with interviews conducted by department heads.
I have participated in numerous interviews led by department heads to assess candidates for quality engineering roles.
I am familiar with the types of questions typically asked by department heads, including technical, behavioral, and situational inquiries.
I have successfully navigated interviews with department heads by showcasing my relevant exp...
I have extensive knowledge of quality management tools such as Six Sigma, Lean, FMEA, and Root Cause Analysis.
Six Sigma: A data-driven approach to process improvement aimed at reducing defects and variation.
Lean: Focuses on eliminating waste and improving efficiency in processes.
FMEA (Failure Mode and Effects Analysis): Identifies potential failure modes in a system and their effects.
Root Cause Analysis: Methodical app...
Control plans and FMEA are tools used in quality engineering to identify and prevent potential failures in processes.
Control plans outline the key steps in a process, the controls in place to ensure quality, and the responsible parties.
FMEA is a systematic approach to identifying potential failure modes in a process, assessing their impact, and developing mitigation strategies.
Both control plans and FMEA are essential ...
Handle customer complaints by listening, empathizing, investigating, resolving, and following up.
Listen to the customer's complaint without interrupting.
Empathize with the customer and acknowledge their concerns.
Investigate the root cause of the complaint to prevent future occurrences.
Resolve the issue promptly and effectively, offering a solution or compensation if necessary.
Follow up with the customer to ensure their...
posted on 21 Aug 2021
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2022. There were 4 interview rounds.
I am currently looking over the sales performance of our new product line.
Analyzing sales data and trends
Monitoring customer feedback and reviews
Assessing market competition and pricing
Evaluating product quality and performance
I am currently responsible for managing relationships with 10 suppliers.
I am currently managing relationships with 10 suppliers.
I ensure timely delivery of goods and services from these suppliers.
I negotiate contracts and pricing with suppliers to ensure cost-effectiveness.
I regularly evaluate supplier performance and address any issues that arise.
I maintain strong communication channels with suppliers to foster positi...
APQP, PPAP, tool development, material types, injection molding defects, painting process, supplier dealing.
APQP (Advanced Product Quality Planning) is a framework used to develop new products and processes.
PPAP (Production Part Approval Process) is a standardized process used to approve new parts for production.
Tool development lead time refers to the time it takes to design and manufacture a new tool for production.
D...
I want to join the organization because of its strong reputation and growth opportunities. My expectation is to contribute to the team's success and develop my leadership skills. My notice period is 30 days.
Strong reputation and growth opportunities
Contribution to team's success
Development of leadership skills
Notice period of 30 days
Design Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Ather Energy
Tork Motors
Ola Electric Mobility
Hero Electric