I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
Lifting safety hazards include strain injuries, falls, and dropped objects.
Use proper lifting techniques to avoid strain injuries
Ensure objects are secure and stable before lifting to prevent drops
Keep work areas clear of obstacles to prevent trips and falls
PTW system stands for Permit to Work system, a formal written system used to control certain types of work that are identified as potentially hazardous.
PTW system is used to ensure that work is carried out safely and in accordance with established procedures.
It involves obtaining permission before starting work in potentially hazardous areas.
The system typically includes risk assessment, identification of hazards, and ...
I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.
Basic aptitude related numerical, english and math
I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.
Quality control in civil engineering involves ensuring that construction materials and methods meet standards and specifications.
Quality control involves inspecting materials and workmanship to ensure they meet project requirements.
Testing materials for strength, durability, and other properties is a key aspect of quality control.
Regular site inspections and audits help identify and address any quality issues before th...
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
Tata Projects interview questions for popular designations
I applied via LinkedIn and was interviewed in Jan 2024. There were 2 interview rounds.
Get interview-ready with Top Tata Projects Interview Questions
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
About Experience Related
Skill Assessment of cability.
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
Question about project
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Cement consumption of M20 concrete mix ratio is 360 kg/m3.
M20 concrete mix ratio is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)
Cement consumption for 1 m3 of M20 concrete is 360 kg
To calculate total cement consumption, multiply 360 kg by the volume of concrete needed
Extra items added in billing should be justified with proper documentation and approval.
Ensure that the extra item was actually used on the project
Check if the extra item was approved by the client or project manager
Document the reason for adding the extra item in the billing
Provide evidence such as photos or receipts to support the inclusion of the extra item
Rate analysis involves calculating the cost of various items in a construction project.
Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the total cost into components like material cost, labor cost, machinery cost, and overheads.
Rate analysis is essential for accurate budgeting and cost estimation in construction projects.
For example, in...
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
Top trending discussions
The duration of Tata Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 550 interviews
Interview experience
based on 5.3k reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
719
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
407
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
387
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
367
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company