Upload Button Icon Add office photos

Suzlon Gujarat Wind Park

Compare button icon Compare button icon Compare

Filter interviews by

Suzlon Gujarat Wind Park Interview Questions, Process, and Tips

Updated 29 Sep 2024

Top Suzlon Gujarat Wind Park Interview Questions and Answers

Suzlon Gujarat Wind Park Interview Experiences

Popular Designations

9 interviews found

Interview Questionnaire 

3 Questions

  • Q1. What is renewable energy
  • Ans. 

    Renewable energy is energy that is derived from natural sources and can be replenished or regenerated over time.

    • Renewable energy is obtained from sources that are naturally replenished, such as sunlight, wind, water, and geothermal heat.

    • Unlike fossil fuels, which are finite and non-renewable, renewable energy sources are virtually inexhaustible.

    • Renewable energy is considered environmentally friendly as it produces litt...

  • Answered by AI
  • Q2. Is codes for batching plant, sieve analysis compressive strength and soil tests
  • Ans. 

    Yes, there are codes for batching plant, sieve analysis, compressive strength, and soil tests.

    • The codes for batching plant include ACI 304R-00: Guide for Measuring, Mixing, Transporting, and Placing Concrete

    • The codes for sieve analysis include ASTM C136-06: Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

    • The codes for compressive strength include ASTM C39/C39M-18: Standard Test Method for Compressi...

  • Answered by AI
  • Q3. What would you do if your batching concrete slump is less than the required amount
  • Ans. 

    I would take immediate action to adjust the mix to meet the required slump.

    • Check the water content and adjust accordingly

    • Add plasticizer or superplasticizer to increase slump

    • Consult with concrete supplier or mix designer for recommendations

    • Perform slump test on site to ensure desired slump is achieved

    • Document the adjustments made for quality control purposes

  • Answered by AI

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Technician Interview Questions & Answers

user image Anonymous

posted on 29 Sep 2024

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please interview date

Technician Interview Questions asked at other Companies

Q1. What kinds of pipe used for hot and cold water supply ?
View answer (8)
Suzlon Gujarat Wind Park Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - Working details and rolls and responsible.

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (88)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

Service Engineer Interview Questions asked at other Companies

Q1. What are the compulsory policy excess in four wheeler private vehicles?
View answer (12)

Suzlon Gujarat Wind Park interview questions for popular designations

 Assistant Manager

 (2)

 Engineer

 (1)

 Technician

 (1)

 Diploma Trainee Engineer

 (1)

 Project Engineer

 (1)

 Project Engineer Mechanical

 (1)

 Civil Site Engineer

 (1)

 Service Engineer

 (1)

I appeared for an interview in Jan 2022.

Interview Preparation Tips

Topics to prepare for Suzlon Gujarat Wind Park Project Engineer interview:
  • Renewable Energy
Interview preparation tips for other job seekers - I am a fresher no experience but am really Hard working students whenever you hired me am never regrate you🤞🙏

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)

I applied via Approached by company and was interviewed in Aug 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always answer confidently and never try to guess the answers that you don't know instead of that simply say no.

Before going for interview just talk with your self for 5 minutes and tell yourself that its not your last interview even if you fail even if you clear god will always have best plans for you.
Good luck

Project Engineer Mechanical Interview Questions asked at other Companies

Q1. How many types of gearbox, function of gearbox , what is mean by FMEA and cp
View answer (2)

I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - All rights in information in detail wind turbine

Diploma Trainee Engineer Interview Questions asked at other Companies

Q1. Wich of the following laws states that: in any electrical network the algebraic sum of the current meeting at a poin is zero ?
View answer (9)

I applied via Walk-in and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. About your self
  • Q2. About your experience
  • Q3. About your role & responsibility
  • Q4. About site activity

Interview Preparation Tips

Interview preparation tips for other job seekers - Preperation of about your experience

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (88)

Engineer Interview Questions & Answers

user image Anonymous

posted on 18 Oct 2021

Interview Questionnaire 

2 Questions

  • Q1. Why r u join Suzlon
  • Q2. Regarding erection.

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (7)

Interview questions from similar companies

I appeared for an interview in Sep 2020.

Interview Questionnaire 

1 Question

  • Q1. There was many technical and project related questions they asked me.

Interview Preparation Tips

Interview preparation tips for other job seekers - We should prepare for competency as per our core functions
Contribute & help others!
anonymous
You can choose to be anonymous

Suzlon Gujarat Wind Park Interview FAQs

How many rounds are there in Suzlon Gujarat Wind Park interview?
Suzlon Gujarat Wind Park interview process usually has 1-2 rounds. The most common rounds in the Suzlon Gujarat Wind Park interview process are Technical, HR and Group Discussion.
What are the top questions asked in Suzlon Gujarat Wind Park interview?

Some of the top questions asked at the Suzlon Gujarat Wind Park interview -

  1. Is codes for batching plant, sieve analysis compressive strength and soil te...read more
  2. What would you do if your batching concrete slump is less than the required amo...read more
  3. What is the generator in used wind turb...read more

Recently Viewed

SALARIES

L&T Power Transmission & Distribution

No Salaries

REVIEWS

West Bengal Power Development Corporation

No Reviews

SALARIES

L&T Power Transmission & Distribution

REVIEWS

West Bengal Power Development Corporation

No Reviews

REVIEWS

West Bengal Power Development Corporation

No Reviews

REVIEWS

West Bengal Power Development Corporation

No Reviews

REVIEWS

West Bengal Power Development Corporation

No Reviews

REVIEWS

West Bengal Power Development Corporation

No Reviews

REVIEWS

West Bengal Power Development Corporation

No Reviews

Tell us how to improve this page.

Suzlon Gujarat Wind Park Interview Process

based on 4 interviews

Interview experience

3.3
  
Average
View more

Interview Questions from Similar Companies

Suzlon Group Interview Questions
4.1
 • 129 Interviews
Torrent Power Interview Questions
3.7
 • 126 Interviews
ReNew Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.3
 • 83 Interviews
GE Vernova Interview Questions
4.1
 • 83 Interviews
Inox Wind Interview Questions
3.7
 • 37 Interviews
Senvion Interview Questions
4.0
 • 18 Interviews
View all

Suzlon Gujarat Wind Park Reviews and Ratings

based on 112 reviews

4.3/5

Rating in categories

4.2

Skill development

4.1

Work-life balance

3.9

Salary

4.0

Job security

4.1

Company culture

3.7

Promotions

4.1

Work satisfaction

Explore 112 Reviews and Ratings
Assistant Manager
14 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
13 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Electrical Engineer
12 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Engineer
10 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Junior Engineer
10 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Suzlon Gujarat Wind Park with

Vestas

4.2
Compare

Siemens Gamesa Renewable Power Private Limited

4.1
Compare

Inox Wind

3.7
Compare

GE Vernova

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent