The height between Dearetor and BFP is important for boiler turbine efficiency, mill principle, and dosings in Dearetor and Boiler drum.
The height ensures proper separation of steam and water in the deaerator.
It allows for efficient operation of the boiler feed pump (BFP).
The dosing of chemicals in the deaerator and boiler drum is optimized with the height difference.
The mill principle is also affected by the height di...
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
The process of plant involves various steps from raw material intake to final product delivery.
Raw material intake and inspection
Processing and manufacturing
Quality control and testing
Packaging and labeling
Storage and inventory management
Delivery and logistics
Answering questions related to difficult maintenance activities and troubleshooting DE system issues.
Performed difficult maintenance activities such as replacing a faulty gearbox in a wind turbine
To physically find out if DE system is jammed, I would inspect the system for any blockages or obstructions
If the bag on DE system is torn, I would conduct a visual inspection and check for any leaks or tears in the bag
I applied via Referral and was interviewed in Aug 2020. There were 3 interview rounds.
The Factory Act 1948 provides for various welfare provisions for workers in factories.
Provision for cleanliness, ventilation, lighting, and drinking water
Provision for safety measures like fencing of machinery, work on dangerous machines, and handling of hazardous substances
Provision for welfare measures like canteens, restrooms, and first aid facilities
Provision for working hours, overtime, and weekly holidays
Provisio...
The process of deploying contract labour involves several steps such as identifying the need, selecting the vendor, negotiating terms, and monitoring performance.
Identify the need for contract labour
Select a vendor through a bidding process or referrals
Negotiate terms and conditions of the contract
Ensure compliance with legal and regulatory requirements
Monitor the performance of the contract labour and vendor
Terminate ...
Steag Energy Services interview questions for popular designations
I applied via Referral and was interviewed before Sep 2021. There was 1 interview round.
Parameters for clarified water include turbidity, pH, conductivity, and total dissolved solids.
Turbidity should be less than 1 NTU
pH should be between 6.5 and 8.5
Conductivity should be less than 1000 µS/cm
Total dissolved solids should be less than 500 mg/L
Get interview-ready with Top Steag Energy Services Interview Questions
Rankine Cycle is a thermodynamic cycle used in steam power plants to convert heat energy into mechanical work.
Rankine Cycle is a theoretical cycle that consists of four processes: compression, heat addition, expansion, and heat rejection.
It is commonly used in steam power plants to generate electricity.
The cycle begins with the compression of a working fluid (usually water) in a pump.
The compressed fluid then enters a ...
Top trending discussions
Some of the top questions asked at the Steag Energy Services interview -
The duration of Steag Energy Services interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 46 interviews
Interview experience
based on 655 reviews
Rating in categories
Patratu,
Khargone
3-5 Yrs
₹ 3.5-5.5 LPA
Noida,
Haldia
6-11 Yrs
Not Disclosed
Senior Engineer
223
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
175
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
171
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
162
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
94
salaries
| ₹0 L/yr - ₹0 L/yr |
Thermax Limited
Siemens
BGR Energy Systems
BHEL