Upload Button Icon Add office photos

Steag Energy Services

Compare button icon Compare button icon Compare

Filter interviews by

Steag Energy Services Interview Questions, Process, and Tips

Updated 31 Jan 2025

Top Steag Energy Services Interview Questions and Answers

View all 44 questions

Steag Energy Services Interview Experiences

Popular Designations

36 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jun 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is motor and MCB.
  • Ans. 

    A motor is a device that converts electrical energy into mechanical energy, while MCB stands for Miniature Circuit Breaker used for electrical protection.

    • Motor is a machine that converts electrical energy into mechanical energy

    • MCB is a Miniature Circuit Breaker used for electrical protection

    • Motors are commonly used in various applications such as fans, pumps, and conveyor belts

    • MCBs are designed to automatically switch ...

  • Answered by AI
  • Q2. Define the types of motor divice.
  • Ans. 

    Types of motor devices include AC motors, DC motors, stepper motors, and servo motors.

    • AC motors: commonly used in household appliances and industrial applications

    • DC motors: used in battery-operated devices and automotive applications

    • Stepper motors: used in precision positioning applications

    • Servo motors: used in robotics and automation for precise control

  • Answered by AI

Operation & Maintenance Engineer Interview Questions asked at other Companies

Q1. Why we do oil test and what are we check in oil test?
View answer (1)

HCLTech

There's no stopping you

We offer diverse programs to shape your career and future

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why do you want to leave your current Company
  • Q2. Speak on your experience and the value you will bring

Business Development Manager Interview Questions asked at other Companies

Q1. If your not getting support from bank or agent, then what will make further to generate business, what is the approach or strategy to be implemented during such cases to convince the customers ?
View answer (14)
Steag Energy Services Interview Questions and Answers for Freshers
illustration image
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2023.

Round 1 - Technical 

(1 Question)

  • Q1. Power Plant boiler field engineer

Department Head Interview Questions & Answers

user image Sharad Kumar

posted on 1 Oct 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. General questions about experience sonfar
  • Q2. Any challenges faced
  • Q3. What Changes would bring about
Round 3 - One-on-one 

(1 Question)

  • Q1. General questions about work experience

Department Head Interview Questions asked at other Companies

Q1. If you are able to manage a class of students where you might expect a fast and a slow learner?
View answer (7)

Steag Energy Services interview questions for popular designations

 Senior Engineer

 (4)

 Engineer

 (2)

 Operations Engineer

 (2)

 Senior Manager-HR

 (1)

 Manager

 (1)

 Maintenance Engineer

 (1)

 Business Development Manager

 (1)

 Senior Executive

 (1)

Interview Questions & Answers

user image Anonymous

posted on 22 May 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Regarding equipment performance related question
Round 3 - Technical 

(1 Question)

  • Q1. Regrading process of performance analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - It is very good organization & seniors are very supportive

Get interview-ready with Top Steag Energy Services Interview Questions

Interview Questions & Answers

user image

posted on 12 Apr 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. What is heat Rate of boiler and how do calculate it?
  • Ans. 

    Heat rate of a boiler is the amount of fuel energy input needed to produce one unit of net electrical power output.

    • Heat rate is expressed in units of Btu/kWh or kcal/kWh.

    • It is calculated by dividing the total fuel energy input by the net electrical power output.

    • Factors affecting heat rate include boiler efficiency, turbine efficiency, and generator efficiency.

    • Heat rate can be improved by optimizing combustion, reducing...

  • Answered by AI
  • Q2. What are uncontrollable losses in boiler?
  • Ans. 

    Uncontrollable losses in boiler are those losses that cannot be controlled by the operator.

    • Unburnt fuel losses

    • Heat loss due to radiation and convection

    • Moisture in fuel and combustion air

    • Blowdown losses

    • Losses due to incomplete combustion

    • Losses due to excess air

    • Losses due to soot and scale buildup

  • Answered by AI
  • Q3. What is balanced drought system?
  • Ans. 

    Balanced drought system is a water management system that balances water supply and demand during droughts.

    • It involves managing water resources to ensure that there is enough water to meet the needs of all users during a drought.

    • This can include measures such as water conservation, water recycling, and water transfers.

    • The goal is to prevent water shortages and ensure that all users have access to water, even during tim...

  • Answered by AI
  • Q4. Can you draw mill operating curve and explain all 6 constraints?
  • Ans. 

    Explanation of mill operating curve and its 6 constraints.

    • Mill operating curve is a graph showing the relationship between production rate and mill load.

    • The 6 constraints are: motor power, feed rate, critical speed, pulp density, mill size, and lifter height.

    • Motor power is the maximum power that can be supplied to the mill.

    • Feed rate is the maximum amount of material that can be fed into the mill.

    • Critical speed is the s...

  • Answered by AI
  • Q5. Calculate Turbine heat rate?
  • Ans. 

    Turbine heat rate is the amount of fuel energy input required to produce one unit of electricity output.

    • Turbine heat rate is calculated by dividing the total fuel energy input by the electricity output.

    • It is usually expressed in British thermal units (BTUs) per kilowatt-hour (kWh).

    • Lower the heat rate, higher the efficiency of the turbine.

    • Factors affecting heat rate include turbine design, fuel quality, and operating co...

  • Answered by AI
  • Q6. What is PLF and what can be done to improve PLF targets?
  • Ans. 

    PLF stands for Plant Load Factor. It is the ratio of actual power generated by a power plant to its maximum possible power generation.

    • Improving maintenance and reducing downtime can increase PLF

    • Upgrading equipment and technology can also improve PLF

    • Optimizing fuel consumption and reducing fuel wastage can increase PLF

    • Implementing energy-efficient practices can also improve PLF

    • For example, a wind power plant can improve...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read and understand power plant operation in details. Interviewer will ask in depth question regarding boiler, it operations and losses

Interview Questionnaire 

3 Questions

  • Q1. What is the difference between onan and onaf
  • Ans. 

    Onan and ONAF are two cooling methods used in transformers.

    • ONAN stands for Oil Natural Air Natural, while ONAF stands for Oil Natural Air Forced.

    • ONAN is a self-cooling method where the transformer is cooled by natural convection of oil and air, while ONAF uses fans to force air over the transformer.

    • ONAF is more efficient than ONAN, but also more expensive.

    • ONAF is used in transformers where the ONAN method is not suffic...

  • Answered by AI
  • Q2. Why used prv in transformer
  • Ans. 

    PRV is used in transformers to regulate the voltage and protect the equipment from overvoltage.

    • PRV stands for Pressure Relief Valve.

    • It regulates the voltage and maintains it within safe limits.

    • It protects the transformer from overvoltage and prevents damage to the equipment.

    • PRV is installed on the transformer tank and is designed to release excess pressure in case of an overvoltage event.

    • It is a safety feature that ens...

  • Answered by AI
  • Q3. Purpose of the transformer simulation test
  • Ans. 

    Transformer simulation test is conducted to ensure the proper functioning of the transformer under different conditions.

    • To verify the transformer's ability to withstand overloads and short circuits

    • To determine the transformer's efficiency and voltage regulation

    • To identify any potential issues with the transformer's insulation or winding

    • To ensure the transformer meets industry standards and specifications

    • Examples of tes...

  • Answered by AI

Skills evaluated in this interview

Electricaltacnician Interview Questions asked at other Companies

Q1. What is the difference between onan and onaf
View answer (1)

I applied via Walk-in and was interviewed in Dec 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Where do you see yourself in 5 years?
Round 2 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips

Interview Preparation Tips

Interview preparation tips for other job seekers - 12 experience dol rdol motor maintenance HT feeder LT feeder maintenance

Electrical Technician Interview Questions asked at other Companies

Q1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,ACB,MOCB,SF6 Breakers, Breake... read more
View answer (4)

Senior Manager Interview Questions & Answers

user image Murthy Sree

posted on 29 Dec 2020

Interview Questionnaire 

4 Questions

  • Q1. If 1× rpm,2×rpm,3×Rpm dominant in the spectrum what are the faults in the rotating equipment
  • Ans. 

    Dominant frequencies of 1×, 2×, and 3× RPM in the spectrum indicate faults in rotating equipment.

    • 1× RPM indicates misalignment or unbalance

    • 2× RPM indicates gear or bearing faults

    • 3× RPM indicates resonance or coupling issues

  • Answered by AI
  • Q2. If abnormal sound listen from mill motor suddenly in the mill surroundings with out vibration analyzer how to diagnose the problem
  • Ans. 

    Diagnosing abnormal sound from mill motor without vibration analyzer

    • Check for any visible signs of damage or wear on the motor and surrounding components

    • Listen for any changes in the sound when the motor is turned off and on again

    • Check the lubrication system and oil levels

    • Inspect the belts and pulleys for any signs of wear or damage

    • Consult with experts or manufacturers for further guidance

  • Answered by AI
  • Q3. Centrifugal pump performance characteristics
  • Ans. 

    Centrifugal pump performance characteristics refer to the relationship between flow rate, head, power, and efficiency.

    • Flow rate is the volume of fluid that passes through the pump per unit time.

    • Head is the energy added to the fluid by the pump and is proportional to the pressure increase.

    • Power is the energy required to operate the pump and is proportional to the flow rate and head.

    • Efficiency is the ratio of the energy ...

  • Answered by AI
  • Q4. Relation between HP & KW relationship
  • Ans. 

    HP and KW are units of power measurement, with HP being the imperial unit and KW being the metric unit.

    • HP stands for horsepower and is commonly used in the United States and other countries that use the imperial system of measurement.

    • KW stands for kilowatt and is commonly used in countries that use the metric system of measurement.

    • 1 horsepower is equal to 0.7457 kilowatts.

    • The relationship between HP and KW is important...

  • Answered by AI

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. What is your strength and weakness?
Round 3 - One-on-one 

(1 Question)

  • Q1. How do you think that you are a fit for this position?

Interview Preparation Tips

Interview preparation tips for other job seekers - The candidate should be clear enough on the role he/she applies for and responsibilities pertaining to the role. Better be precise on answers that should directly be related to the questions.

Senior Manager-HR Interview Questions asked at other Companies

Q1. Is bell curve methodology useful for appraisals. How does it effect long tenured employees.
View answer (2)
Contribute & help others!
anonymous
You can choose to be anonymous

Steag Energy Services Interview FAQs

How many rounds are there in Steag Energy Services interview?
Steag Energy Services interview process usually has 2-3 rounds. The most common rounds in the Steag Energy Services interview process are Technical, HR and Resume Shortlist.
How to prepare for Steag Energy Services interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Steag Energy Services. The most common topics and skills that interviewers at Steag Energy Services expect are thermal power plant, Gas Turbine, Power Plant, Turbine and Boiler.
What are the top questions asked in Steag Energy Services interview?

Some of the top questions asked at the Steag Energy Services interview -

  1. APH leakage what type problem in Boiler and identify of leakag...read more
  2. if 1× rpm,2×rpm,3×Rpm dominant in the spectrum what are the faults in the r...read more
  3. if abnormal sound listen from mill motor suddenly in the mill surroundings with...read more
How long is the Steag Energy Services interview process?

The duration of Steag Energy Services interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

SALARIES

Manappuram Finance

SALARIES

Manappuram Finance

No Salaries

INTERVIEWS

Doosan Power Systems

No Interviews

SALARIES

Manappuram Finance

SALARIES

Manappuram Finance

SALARIES

Manappuram Finance

SALARIES

Manappuram Finance

SALARIES

Manappuram Finance

SALARIES

Manappuram Finance

SALARIES

Manappuram Finance

Tell us how to improve this page.

Steag Energy Services Interview Process

based on 46 interviews

Interview experience

4.4
  
Good
View more

Sopra Steria

Success to our employee's well-being? A work-life balance that's simply unbeatable.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 418 Interviews
Thermax Limited Interview Questions
4.1
 • 251 Interviews
Adani Power Interview Questions
3.9
 • 218 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
L&T Power Interview Questions
3.9
 • 33 Interviews
View all

Steag Energy Services Reviews and Ratings

based on 655 reviews

4.2/5

Rating in categories

4.0

Skill development

4.1

Work-life balance

3.9

Salary

4.5

Job security

4.0

Company culture

3.7

Promotions

4.0

Work satisfaction

Explore 655 Reviews and Ratings
Senior Engineer
223 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
175 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
171 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
162 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
94 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Steag Energy Services with

Thermax Limited

4.1
Compare

Siemens

4.1
Compare

BGR Energy Systems

3.8
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent