The procedure for building construction involves several steps and processes.
Developing a project plan and obtaining necessary permits
Clearing the construction site and preparing the foundation
Constructing the structural framework and installing utilities
Completing interior and exterior finishes
Conducting inspections and obtaining certificates of occupancy
Handing over the completed building to the owner
I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.
About high rise buildings and construction
I applied via Naukri.com and was interviewed in May 2023. There were 2 interview rounds.
A work permit is a written authorization that specifies the work to be done and the precautions to be taken before work can begin. ISO stands for International Organization for Standardization. Hira is a Hazard Identification and Risk Assessment process. Safety net is a fall protection system used in construction.
Work permit is a written document that authorizes specific work to be done in a safe manner
It outlines the ...
Nyati Group interview questions for popular designations
FDD field dry density test is a method to determine the density of soil in the field.
FDD stands for Field Dry Density.
It is a test conducted on soil to measure its density.
The test involves extracting a soil sample from the field and determining its dry weight and volume.
The dry density is calculated by dividing the dry weight of the soil sample by its volume.
This test helps in assessing the compaction and quality of s
The slump in column concreting should be between 150-175 mm.
The slump should be measured before pouring the concrete.
The slump should be consistent throughout the column.
The slump should not exceed 175 mm to avoid segregation.
The slump should not be less than 150 mm to ensure proper compaction.
The slump can be adjusted by adding water or admixtures.
The slump test should be performed according to ASTM standards.
Slump in column concreting 90 to 100 mm
Slump refers to the consistency of the concrete mix
A slump of 90 to 100 mm indicates a very wet and unstable mix
This can lead to issues with the structural integrity of the column
Possible causes include incorrect water-cement ratio or improper mixing
Solutions may include adjusting the mix proportions or using additives to improve stability
Get interview-ready with Top Nyati Group Interview Questions
I was interviewed before Jun 2023.
How you face incident, workers and management pressure.
I applied via Naukri.com and was interviewed before Nov 2023. There were 3 interview rounds.
Calculating BBS and quantity takeoff
Calculate the Bar Bending Schedule (BBS) by determining the quantity of reinforcement bars required for a project
Consider the drawings, specifications, and structural requirements to accurately calculate the BBS
Use software tools like Excel, AutoCAD, or specialized estimation software for efficient calculations
Ensure accuracy in measurements and calculations to avoid material wastage...
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
Cube casting and testing is a method to determine the compressive strength of concrete.
Cubes are casted from a sample of fresh concrete
The cubes are cured for a specific period of time
The cubes are then tested for compressive strength
The number of cubes to be casted depends on the project specifications
Typically, 3 to 5 cubes are casted for every 50 cubic meters of concrete
Top trending discussions
Some of the top questions asked at the Nyati Group interview -
The duration of Nyati Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 33 interviews
Interview experience
based on 292 reviews
Rating in categories
Junior Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
81
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Godrej Industries Group
Tata Group
Adani Group
Reliance Industries