i
KONE
Filter interviews by
I applied via Naukri.com and was interviewed before Aug 2021. There were 4 interview rounds.
Rate your
company
🤫 100% anonymous
How was your last interview experience?
I applied via Referral and was interviewed in Apr 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Oct 2021. There were 4 interview rounds.
I applied via Job Portal and was interviewed in Apr 2021. There was 1 interview round.
KONE interview questions for popular designations
I applied via Referral and was interviewed before Nov 2020. There were 3 interview rounds.
The current expectation varies depending on the industry and market trends.
Expectation for product quality and innovation is high
Customers expect personalized experiences
Sustainability and ethical practices are becoming more important
Remote work and digital communication are expected to continue
Rapid adaptation to changing circumstances is necessary
Get interview-ready with Top KONE Interview Questions
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 5 interview rounds.
Elevator breakdown refers to the malfunction or failure of an elevator system.
Elevator breakdown can occur due to various reasons such as mechanical issues, power failure, or sensor malfunction.
When an elevator breaks down, it may get stuck between floors, preventing people from using it.
In such situations, technicians are called to diagnose and fix the problem to restore the elevator's functionality.
Regular maintenanc...
There are several types of elevator controllers used in different elevator systems.
Relay-based controllers: These controllers use relays to control the movement of the elevator car.
Microprocessor-based controllers: These controllers use microprocessors to control the elevator's operation.
Hydraulic controllers: These controllers are specifically designed for hydraulic elevator systems.
Traction controllers: These control...
Elevator control system is responsible for managing the movement and operation of elevators.
Elevator control system coordinates the movement of multiple elevators in a building.
It ensures efficient and safe transportation of passengers or goods between different floors.
The system includes components like buttons, sensors, motors, and a central control unit.
It uses algorithms to optimize elevator routes and minimize wai...
The types of motors used for lift installation include AC motors, DC motors, and gearless motors.
AC motors are commonly used in lifts due to their reliability and ability to handle heavy loads.
DC motors are used in lifts that require precise control and smooth operation.
Gearless motors are used in high-rise buildings as they provide high torque and require less maintenance.
Examples of AC motor brands used in lifts incl...
I worked in a fast-paced environment at my previous company, where attention to detail and accuracy were crucial.
Performed various laboratory tests and experiments
Maintained and calibrated laboratory equipment
Analyzed data and prepared reports
Followed strict safety protocols and procedures
Collaborated with team members on projects
I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2021. There were 5 interview rounds.
Top trending discussions
The duration of KONE interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 100 interviews
Interview experience
Anonymously discuss salaries, work culture, and many more
Get Ambitionbox App
based on 1.4k reviews
Rating in categories
Design Engineer
191
salaries
| ₹2 L/yr - ₹9.4 L/yr |
Assistant Manager
148
salaries
| ₹6.2 L/yr - ₹19 L/yr |
Senior Engineer
134
salaries
| ₹5 L/yr - ₹13.3 L/yr |
Engineer
115
salaries
| ₹2.4 L/yr - ₹10.3 L/yr |
Process Agent
113
salaries
| ₹2.3 L/yr - ₹5.2 L/yr |
Schindler
Otis Elevator
TK Elevator
Johnson Lifts