Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Kalpataru Limited Team. If you also belong to the team, you can get access from here

Kalpataru Limited Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Kalpataru Limited Interview Questions, Process, and Tips

Updated 19 Feb 2025

Top Kalpataru Limited Interview Questions and Answers

View all 46 questions

Kalpataru Limited Interview Experiences

Popular Designations

71 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Aptitude Test 

The technical assessment conducted in the first round included basic questions focused on core civil engineering concepts.

Round 2 - Technical 

(2 Questions)

  • Q1. Internship experience
  • Ans. 

    I completed a 6-month internship at a construction company where I gained hands-on experience in project management and site supervision.

    • Assisted in creating project schedules and budgets

    • Conducted site inspections and quality control checks

    • Collaborated with engineers and contractors on various projects

  • Answered by AI
  • Q2. Strength and weakness

Top Kalpataru Limited Civil Engineer Interview Questions and Answers

Q1. What types of equipment are used for leveling and what are the different types of surveys?
View answer (1)

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Graduate Engineer Interview Questions & Answers

user image Rushabh Shah

posted on 27 Jan 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Aptitude Test 

It was a technical as well as Aptitude based test.

Round 2 - Technical 

(1 Question)

  • Q1. I got a lot of questions related to my internship experience. The interview panel was really good and cooperating.

Graduate Engineer Interview Questions asked at other Companies

Q1. What is Finite Element Analysis? Explain using examples.
View answer (1)
Kalpataru Limited Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Describe your current job role
  • Ans. 

    I oversee the technology department, manage projects, and ensure smooth operations.

    • Manage a team of developers and IT professionals

    • Develop and implement technology strategies

    • Ensure systems are secure and up-to-date

    • Collaborate with other departments to meet business goals

  • Answered by AI

Assistant General Manager Technology Interview Questions asked at other Companies

Q1. What are the metrics involved in evaluating the team member performance?
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Billing Process

Interview Preparation Tips

Interview preparation tips for other job seekers - Short time service and learning

Senior Billing Engineer Interview Questions asked at other Companies

Q1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockwork
View answer (2)

Kalpataru Limited interview questions for popular designations

 Civil Engineer

 (9)

 Assistant Engineer

 (4)

 Senior Engineer

 (3)

 Engineer Trainee

 (3)

 Assistant Engineer - Civil

 (2)

 Management Trainee

 (2)

 Senior Civil Engineer

 (2)

 Executive

 (2)

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Surveying levelling

Engineer Trainee Interview Questions asked at other Companies

Q1. If 10 people had a meeting and they shake hands only once with each of the others, then how many handshakes will be there in total ?
View answer (8)

Get interview-ready with Top Kalpataru Limited Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. How are you Anil?
  • Q2. Is this right to talk?
Round 3 - One-on-one 

(3 Questions)

  • Q1. Please write down the sequence of works of construction and so on.
  • Ans. 

    The sequence of works in construction typically involves planning, site preparation, foundation work, structural construction, finishing touches, and final inspection.

    • Planning: Develop project plans, obtain permits, and create a timeline.

    • Site preparation: Clear the site, set up temporary facilities, and install utilities.

    • Foundation work: Excavate, pour footings, and construct foundation walls.

    • Structural construction: B...

  • Answered by AI
  • Q2. Brief about your past work experience and challenges you faced during and solutions you came out with and learns from those mistakes.
  • Q3. What is your salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Go into Kalptaru with good hike and work in there without a huge expectations. I'm pretty sure you will come out with lot of skills and knowledge.

Assistant Engineer Interview Questions asked at other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)

Jobs at Kalpataru Limited

View all
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. All stores related questions asked for me given ansars
  • Q2. How you know kalpataru

Assistant Store Manager Interview Questions asked at other Companies

Q1. 2. What about kpi' importance in retail
View answer (37)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Cement testing, mix design, iso 9001

Interview Preparation Tips

Interview preparation tips for other job seekers - Good at the end but HR response is too late

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)

Planning Manager Interview Questions & Answers

user image SWARUP SIKDER

posted on 13 Sep 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About experience

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions related to tendering & understanding solar projects
Round 3 - One-on-one 

(1 Question)

  • Q1. Face to face interview regarding solar project knowledge, tender analysis
Round 4 - HR 

(1 Question)

  • Q1. Negotiation, why want to leave previous job

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (69)
Contribute & help others!
anonymous
You can choose to be anonymous

Kalpataru Limited Interview FAQs

How many rounds are there in Kalpataru Limited interview?
Kalpataru Limited interview process usually has 1-2 rounds. The most common rounds in the Kalpataru Limited interview process are Technical, One-on-one Round and HR.
How to prepare for Kalpataru Limited interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kalpataru Limited. The most common topics and skills that interviewers at Kalpataru Limited expect are Real Estate, SAP, Accounting, MIS and Sales.
What are the top questions asked in Kalpataru Limited interview?

Some of the top questions asked at the Kalpataru Limited interview -

  1. How much accepted 8mm to 10mm steel rod rolling margine valu...read more
  2. Aluminium (mivan) structure sequence of activiti...read more
  3. What are customer issues related to monsoon and how did you handle the...read more
How long is the Kalpataru Limited interview process?

The duration of Kalpataru Limited interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

REVIEWS

Equitas Small Finance Bank

No Reviews

REVIEWS

Equitas Small Finance Bank

No Reviews

REVIEWS

Equitas Small Finance Bank

No Reviews

PHOTOS

Aparna Constructions and Estates

No Photos

INTERVIEWS

Dr. Reddy's

No Interviews

SALARIES

Equitas Small Finance Bank

No Salaries

SALARIES

Equitas Small Finance Bank

Tell us how to improve this page.

Kalpataru Limited Interview Process

based on 91 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
Piramal Group Interview Questions
3.9
 • 62 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
View all

Kalpataru Limited Reviews and Ratings

based on 831 reviews

4.0/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

3.6

Salary

4.1

Job security

3.7

Company culture

3.4

Promotions

3.7

Work satisfaction

Explore 831 Reviews and Ratings
Manager - Quality- Borivali Site

Mumbai

13-16 Yrs

₹ 10-19 LPA

Manager- Architect Strategic Coordinator

Mumbai

5-10 Yrs

₹ 15-30 LPA

Billing Engineer- Jogeshwari site

Mumbai

5-10 Yrs

₹ 4-8 LPA

Explore more jobs
Assistant Manager
243 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
165 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
106 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
94 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
88 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Kalpataru Limited with

Tata Group

4.2
Compare

Adani Group

3.9
Compare

Reliance Industries

4.0
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent