Filter interviews by
Yes, I am willing to work against advance payment for your Brand.
I understand the company's need for financial security and am willing to accommodate their request.
Working against advance payment can help build trust and long-term relationships with clients.
I have successfully worked on similar payment terms in the past with positive outcomes.
The volume expected from the designated area will depend on various factors such as market size, competition, and customer demand.
Consider the population size and demographics of the area
Analyze the purchasing power and consumer behavior in the area
Evaluate the market share of competitors in the area
Take into account any upcoming events or trends that may impact sales
Use historical data and sales forecasts to make an e
I would like to mention my experience in successfully leading a sales team and exceeding targets consistently.
Highlighting my track record of exceeding sales targets
Emphasizing my leadership skills in managing and motivating a sales team
Mentioning any specific strategies or initiatives I have implemented to drive sales growth
Top trending discussions
I am a highly skilled System Engineer with expertise in designing and implementing complex systems.
Experienced in managing and troubleshooting network infrastructure
Proficient in virtualization technologies such as VMware and Hyper-V
Strong knowledge of operating systems like Windows and Linux
Familiar with scripting languages like PowerShell and Bash
Excellent problem-solving and communication skills
Yes, I have experience working in teams.
I have worked on several group projects during my studies.
I have collaborated with colleagues to solve complex technical problems.
I have participated in cross-functional teams to implement system upgrades.
I have also been part of agile development teams, working closely with software engineers and testers.
One example of teamwork is when I led a team of engineers to successfully d
Polymorphism is the ability of an object to take on many forms. In C++, it is achieved through function overloading and virtual functions.
Polymorphism allows objects of different classes to be treated as objects of a common base class.
Function overloading enables multiple functions with the same name but different parameters.
Virtual functions allow derived classes to override base class functions.
Find sum of all numbers formed from root to leaf path in a binary tree
Traverse the binary tree using DFS
At each leaf node, add the number formed from root to leaf path to a sum variable
Return the sum variable
Time complexity: O(n)
Example: For a binary tree with root value 1, left child 2 and right child 3, the sum would be 12 + 13 = 25
Given a string, print all possible strings that can be made by placing spaces (zero or one) in between them.
Use recursion to generate all possible combinations of spaces
For each recursive call, either add a space or don't add a space between the current character and the next character
Base case is when there are no more characters left to add spaces between
Time complexity is O(2^n) where n is the length of the string
Preorder traversal without recursion
Use a stack to keep track of nodes
Push right child first and then left child onto stack
Pop top of stack and print value
Repeat until stack is empty
Find longest continuous patch on a 12 km road with updates in patches
Maintain a variable to keep track of current patch length
Update the variable whenever a new patch is added
Maintain a variable to keep track of longest patch so far
Compare current patch length with longest patch length and update if necessary
Use a sorted data structure like a binary search tree to store the patches for efficient search
Time complexity: ...
Find median of an unsorted array.
Sort the array and find the middle element
Use quickselect algorithm to find the median in O(n) time
If the array is small, use brute force to find the median
Find 'k' elements closest to a given number from a stream of characters.
Use a priority queue to keep track of closest elements.
Update the queue as new characters come in.
Return the 'k' closest elements from the queue.
Design a data structure with O(1) insert, remove, find-max, and delete-max operations.
Use a doubly linked list to maintain the elements in sorted order.
Use a hash table to store the pointers to the nodes in the linked list.
Maintain a pointer to the maximum element in the hash table.
Update the pointers in the hash table when inserting or removing elements.
Update the maximum pointer when deleting or inserting the maximum
Check if a given linked list is a palindrome.
Traverse the linked list and store the values in an array.
Compare the first and last elements of the array, then move towards the center.
If all elements match, the linked list is a palindrome.
Alternatively, use two pointers to find the middle of the linked list and reverse the second half.
Compare the first half with the reversed second half to check for a palindrome.
No, I am not a loner.
I enjoy working in a team and collaborating with others.
I believe that teamwork leads to better results.
I am comfortable working with people from diverse backgrounds.
I actively seek out opportunities to network and build relationships.
I am a good listener and value the opinions of others.
based on 1 interview
Interview experience
Haldiram Foods International Limited
Bikanervala
MTR Foods
Gits Food Products