Upload Button Icon Add office photos

Indo Farm Equipment

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Indo Farm Equipment Project Manager-Production/Manufacturing/Maintenance Interview Questions and Answers

Updated 15 Feb 2021

Indo Farm Equipment Project Manager-Production/Manufacturing/Maintenance Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is the metal of file
  • Ans. 

    The metal of a file is typically steel.

    • The metal used in files is usually steel due to its hardness and durability.

    • Steel files are commonly used in production, manufacturing, and maintenance industries.

    • Other metals like high carbon steel or tungsten carbide may also be used for specific applications.

    • The choice of metal depends on the intended use of the file, such as cutting, shaping, or smoothing materials.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I have no idea

Interview questions from similar companies

I appeared for an interview in Aug 2017.

Interview Questionnaire 

1 Question

  • Q1. Simple quation our working experience

Interview Preparation Tips

Round: Technical + HR Interview
Experience: Resolve field issue problem 557 gear dent noise use method control chart, 7QC tools
Good kaizen 557 differential spacer missing by operator new tool provide for ensure after assembly space fitting complete checked and marking IDIC
Resolve big problem during transmission testing gear dent noise, during assembly all gear tooth checked no chamfer on gear tooth. Eliminate interference on tooth profile the corner of the top land, or modified the tooth profile for smooth meshing.
ADDC hydraulic system problem face during testing addc not working prv not working position and draft leaver not working eliminate problem by material, machine, operator and proper training for assembly and addc final testing. Resolve big problem minor stoppage line productivity improved reduce line stoppage
Safety provide for on line gear box assembly because unsafe condition operator gear box assembly provide for lock CTF and G1 housing after eliminate incident case.


Round: Group Activity
Experience: my dicipline working place and communication skill

Round: Case Study Interview
Experience: Good kaizen 557 differential spacer missing by operator new tool provide for ensure after assembly space fitting complete checked and marking IDIC
Resolve big problem during transmission testing gear dent noise, during assembly all gear tooth checked no chamfer on gear tooth. Eliminate interference on tooth profile the corner of the top land, or modified the tooth profile for smooth meshing


Round: Test
Experience: good dicipline good working nice quation
Duration: 15 minutes
Total Questions: -7

I applied via Campus Placement and was interviewed before Feb 2021. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - First you will check your Job Discription.
If you have clear knowledge of your academic project so that is the more effective in the interview because 40 to 50% question covered on your project topic,
And remaining questions related to technically verify your knowledge

Interview Questionnaire 

1 Question

  • Q1. About my self

I applied via Campus Placement and was interviewed before Jul 2021. There were 5 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and show your skill while interview
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Interview Preparation Tips

Interview preparation tips for other job seekers - We get to know who our truest friends are during those moments in life when we are at our lowest points. Never ostracize, sideline or look down upon someone simply because they do not have a job. Be there and be available.

I applied via Referral and was interviewed before Sep 2017. There were 2 interview rounds.

Interview Preparation Tips

Round: Offer letter
Experience: I got confirmation from HR at December, but they gave letter in march month, day by day I have to call them and follow for the offer letter, They gave offer letter after 3 months, but ask me to join within one month.

General Tips: Please dont prefer to work in Mahindra and dont spoil your carrier.
Duration: 1-3 Months

I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. In field wat u will do

Interview Preparation Tips

Interview preparation tips for other job seekers - Better interview in Kubota tractor devanahalli
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

CAMPUS PLACEMENT

Rural Polytechnic, Haunsbhavi

CAMPUS PLACEMENT

BLDE University, Bijapur

INTERVIEWS

Thyssenkrupp Industrial Solutions

No Interviews

INTERVIEWS

Thermax Babcock Wilcox Energy Solutions

No Interviews

INTERVIEWS

Hyundai Construction Equipment

No Interviews

CAMPUS PLACEMENT

Indian Institute of Technology (IIT), Gandhinagar

INTERVIEWS

Thermax Babcock Wilcox Energy Solutions

No Interviews

INTERVIEWS

Kirloskar Toyota Textile Machinery

No Interviews

INTERVIEWS

Thyssenkrupp Industrial Solutions

No Interviews

INTERVIEWS

Hyundai Construction Equipment

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 251 Interviews
John Deere Interview Questions
4.1
 • 228 Interviews
Sonalika Tractors Interview Questions
3.6
 • 129 Interviews
Force Motors Interview Questions
3.6
 • 117 Interviews
CNH Industrial Interview Questions
3.8
 • 55 Interviews
View all

Indo Farm Equipment Project Manager-Production/Manufacturing/Maintenance Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

3.0

Salary

4.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
35 salaries
unlock blur

₹4.4 L/yr - ₹8.2 L/yr

Assistant Engineer
34 salaries
unlock blur

₹1.6 L/yr - ₹3.3 L/yr

Engineer
32 salaries
unlock blur

₹2.5 L/yr - ₹4.1 L/yr

Sales Executive
30 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Diploma Trainee Engineer
22 salaries
unlock blur

₹1 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Indo Farm Equipment with

Mahindra & Mahindra

4.1
Compare

Tractors and Farm Equipment

4.1
Compare

Sonalika Tractors

3.6
Compare

Escorts Kubota Limited

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent