Six Sigma is a data-driven methodology aimed at process improvement and reducing defects, often visualized using a bell curve.
Six Sigma focuses on reducing process variation and improving quality.
It uses statistical tools to analyze data and identify defects.
The term 'Six Sigma' refers to achieving a process standard deviation of six, meaning only 3.4 defects per million opportunities.
In a bell-shaped curve, most data ...
DMAIC is a data-driven quality strategy used for process improvement in Six Sigma.
Define: Identify the problem and project goals. Example: Reducing patient wait times in a clinic.
Measure: Collect data to understand current performance. Example: Measuring average wait times over a month.
Analyze: Identify root causes of defects or issues. Example: Analyzing data to find bottlenecks in patient flow.
Improve: Develop and im...
I envision a dynamic career at Bosch, focusing on leadership, innovation, and contributing to sustainable solutions.
Aim to take on leadership roles, such as leading a project team within the first two years.
Pursue continuous learning through Bosch's training programs to enhance my technical skills.
Contribute to innovative projects that align with Bosch's sustainability goals, like developing eco-friendly technologies.
N...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2017. There were 8 interview rounds.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
posted on 22 May 2024
I was interviewed in Apr 2024.
IATF focuses on automotive industry requirements while ISO 9001 is a generic quality management standard.
IATF 16949 is specifically designed for automotive industry suppliers
ISO 9001 is a generic quality management standard applicable to any industry
IATF 16949 includes additional automotive-specific requirements such as production part approval process (PPAP)
Both standards emphasize continual improvement and customer s
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
The steps of contract creation involve offer, acceptance, consideration, and mutual agreement.
Offer: One party proposes terms to another party.
Acceptance: The other party agrees to the terms proposed.
Consideration: Both parties exchange something of value.
Mutual agreement: Both parties come to a meeting of the minds.
Drafting: The contract is written and reviewed by both parties.
Execution: Both parties sign the contract...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I have handled three types of chillers: Screw, Centrifugal, and Scroll.
I have experience working with Screw, Centrifugal, and Scroll chillers.
I am familiar with the maintenance and operation of these types of chillers.
For example, I have worked with a 200-ton Centrifugal chiller at my previous job.
Surge in centrifugal chiller is a condition where the flow of refrigerant is disrupted, causing a drop in pressure and flow rate.
Surge can occur when the chiller is operating at low load or when there is a sudden change in load.
It can cause damage to the compressor and other components of the chiller.
Surge can be prevented by using surge control devices such as inlet guide vanes, variable speed drives, and surge tanks.
...
I was interviewed before Mar 2022.
Yes, I have extensive B2B experience in order to cash.
I have worked as a sales representative for a B2B company for 3 years
I have managed accounts payable and receivable for a B2B company for 2 years
I have experience negotiating payment terms and resolving payment disputes with B2B clients
I am familiar with B2B invoicing and payment processing systems such as SAP and Oracle
based on 1 interview
Interview experience
Senior Engineer
854
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
794
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
658
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
512
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
494
salaries
| ₹0 L/yr - ₹0 L/yr |
Siemens
ABB
Schneider Electric
Honeywell Automation