I applied via Walk-in and was interviewed in Aug 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Questions will be asked on your work experience. The works you have done in the site.
  • Q2. How to control steel wastage?
  • Ans. 

    Steel wastage can be controlled by proper planning, material handling, and inventory management.

    • Use accurate measurements and cutting techniques to minimize scrap

    • Ensure proper storage and handling of steel to prevent damage and corrosion

    • Implement inventory management systems to track usage and reduce over-ordering

    • Train workers on proper handling and cutting techniques to minimize errors

    • Reuse or recycle scrap steel when

  • Answered by AI
  • Q3. Quantity of cement & flyash in M40 grade concrete?
  • Ans. 

    The quantity of cement & fly ash in M40 grade concrete varies based on the mix design.

    • M40 grade concrete requires a minimum of 400 kg of cement per cubic meter of concrete.

    • Fly ash can be used as a partial replacement for cement in concrete.

    • The percentage of fly ash used in the mix design can range from 0-30%.

    • The exact quantity of cement and fly ash in M40 grade concrete depends on the specific mix design being used.

  • Answered by AI
  • Q4. Deduction of steel for a 45 & 90 degree bend?
  • Ans. 

    Deduction of steel for a 45 & 90 degree bend

    • For a 45 degree bend, deduct 1.5 times the diameter of the bar

    • For a 90 degree bend, deduct 2 times the diameter of the bar

    • This deduction is necessary to account for the length of the bend

    • The deduction varies based on the diameter of the bar being bent

    • The deduction is typically specified in the design drawings or codes

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be sure and honest with your working experience. Dont say anything extra that you haven't done in site before.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What an all projects you worked in oil and gas? How you design structure

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company
Contribute & help others!
anonymous
You can choose to be anonymous

Apco Infratech Interview FAQs

What are the top questions asked in Apco Infratech Civil Structural Engineer interview?

Some of the top questions asked at the Apco Infratech Civil Structural Engineer interview -

  1. Deduction of steel for a 45 & 90 degree ben...read more
  2. Quantity of cement & flyash in M40 grade concre...read more
  3. How to control steel wastag...read more

Recently Viewed

INTERVIEWS

Apco Infratech

No Interviews

SALARIES

Apco Infratech

LIST OF COMPANIES

Larsen & Toubro Limited

Locations

SALARIES

Apco Infratech

SALARIES

Apco Infratech

SALARIES

Egis India Consulting Engineers

INTERVIEWS

Apco Infratech

No Interviews

LIST OF COMPANIES

Simplex Infrastructures

Locations

INTERVIEWS

Apco Infratech

No Interviews

LIST OF COMPANIES

Reliance Infrastructure

Locations

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 115 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.1
 • 60 Interviews
View all
Apco Infratech Civil Structural Engineer Salary
based on 11 salaries
₹2.6 L/yr - ₹5.8 L/yr
26% less than the average Civil Structural Engineer Salary in India
View more details

Apco Infratech Civil Structural Engineer Reviews and Ratings

based on 2 reviews

2.3/5

Rating in categories

1.5

Skill development

1.7

Work-life balance

1.5

Salary

1.7

Job security

1.7

Company culture

1.5

Promotions

2.3

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
138 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
134 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
92 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Officer
69 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Apco Infratech with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview