Filter interviews by
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Newspaper Ad and was interviewed before Nov 2022. There were 3 interview rounds.
I have 3 years of experience as a Store Officer and my preferred work location is in a retail store.
I have 3 years of experience as a Store Officer
I am familiar with inventory management, stock control, and procurement processes
I have experience in maintaining accurate records and conducting regular stock audits
I am proficient in using inventory management software and MS Excel for data analysis
My preferred work locati...
To manage stores effectively, one must focus on inventory control, organization, and efficient procurement processes.
Implement a robust inventory management system to track stock levels and ensure timely replenishment.
Categorize and label products for easy identification and retrieval.
Establish proper storage and shelving systems to maximize space utilization.
Regularly conduct stock audits to identify discrepancies and...
The procedure of stores involves the management and control of inventory, including receiving, storing, issuing, and maintaining records.
Receiving goods and materials from suppliers
Inspecting and verifying the received items
Storing the items in appropriate locations
Maintaining inventory records and updating stock levels
Issuing items as per requisitions or orders
Ensuring proper documentation and record-keeping
Conducting...
What people are saying about Amara Raja Infra
I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.
Amara Raja Infra interview questions for popular designations
I applied via Naukri.com and was interviewed in Feb 2021. There were 5 interview rounds.
The unit weight of reinforcement bar can be found by calculating the weight per unit length.
The unit weight of reinforcement bar is calculated by dividing the weight of the bar by its length.
The weight of the bar can be determined by multiplying the cross-sectional area of the bar by the density of the material.
The length of the bar is measured in meters or feet, depending on the unit system used.
The density of the mat...
Unit weights of building materials are important for quantity surveying.
Unit weight of concrete is around 2400 kg/m³
Unit weight of brick is around 1920 kg/m³
Unit weight of steel is around 7850 kg/m³
Unit weight of timber is around 500 kg/m³
Unit weight of glass is around 2500 kg/m³
Manpower productivity refers to the efficiency of workers in completing tasks within a given timeframe.
It is important to measure and track productivity to identify areas for improvement.
Factors that can affect productivity include training, equipment, and work environment.
Productivity can be improved through better planning, organization, and communication.
Examples of productivity measures include output per worker, t...
The procedure for billing involves preparing an invoice based on the work completed and submitting it to the client for payment.
Review the contract to ensure all work completed is billable
Prepare an invoice detailing the work completed and the corresponding costs
Submit the invoice to the client for payment within the agreed upon timeframe
Follow up with the client to ensure payment is received on time
Yes, bar bending schedule is calculated by determining the number, length, and shape of bars required for a reinforced concrete structure.
Calculate the total length of bars required for each size and type
Determine the number of bars required for each size and type
Calculate the shape and bending details of each bar
Prepare a detailed schedule of all the bars required for the structure
Ensure compliance with design and con
Get interview-ready with Top Amara Raja Infra Interview Questions
I applied via Naukri.com
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Sep 2018. There were 5 interview rounds.
I was interviewed in Dec 2016.
QA focuses on preventing defects in the software development process, while QC focuses on identifying defects in the final product.
QA stands for Quality Assurance and QC stands for Quality Control.
QA is a proactive process that focuses on preventing defects by establishing processes and standards, while QC is a reactive process that focuses on identifying defects in the final product.
QA involves activities like require...
To judge the product physically, perform visual inspections, measurements, and functional tests.
Conduct visual inspections to check for any defects or abnormalities in the product's appearance.
Perform measurements to ensure the product meets the required specifications and tolerances.
Conduct functional tests to verify that the product performs its intended functions correctly.
Compare the physical attributes of the prod...
Concrete mix design is a process of determining the proportions of various ingredients to achieve desired properties of concrete.
Concrete mix design involves selecting suitable materials and determining their proportions.
The mix design considers factors such as strength, workability, durability, and economy.
IS standards, such as IS 10262, provide guidelines for concrete mix design in India.
The design process includes c...
Concrete cubes break more at the middle due to the distribution of stress and the presence of weak points.
The middle of the cube experiences the highest stress during compression testing.
The distribution of stress is not uniform throughout the cube.
The presence of weak points, such as air voids or aggregate discontinuities, can cause the cube to break at the middle.
The middle of the cube is where the maximum compressiv...
The duration of Amara Raja Infra interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 42 interviews
Interview experience
based on 280 reviews
Rating in categories
Assistant Manager
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
GMR Group
Reliance Infrastructure